PREPARATION

A )  Inspect the packaging and the IQ System Controller 2 for damage. Do 

not install or use the IQ System Controller 2 if it has been damaged in 

any way.

B )  Ensure that you have the following: 

• 

One Enphase IQ System Controller 2. The IQ System Controller 2 shipping 

box contains an Enphase IQ System Controller 2, mounting bracket, 

mounting hardware, and literature kit (bag with labels and accessories: 

150-00148). Among the accessories are four-pin receptacles/dry contacts 

that will be used for controlling external power relays.

*

 

WARNING: 

The IQ System Controller 2 weighs 39.4 kg (87 lbs) and 

will require two persons to lift the unit.

C )  Make sure you have the following 

required

 items:

• 

Enphase IQ Battery, which is required for off-grid applications.

• 

The Enphase IQ System Controller 2 requires a wireless connection 

to an IQ Gateway, which requires an Internet connection. Failure to 

maintain an Internet connection may have an impact on the warranty. 

See 

enphase.com/warranty

 for full terms and services.

• 

Wireless USB Adapter (COMMS-KIT-01) to be installed at IQ Gateway 

for communications with IQ Battery and IQ System Controller 2. 

Includes USB cable for connection to IQ Gateway and allows wireless 

communication with IQ Battery and IQ System Controller 2.

• 

Two current transformers (CT-200-SPLIT) for consumption monitoring

• 

One current transformer (CT-200-SOLID) for production metering

• 

IQ System Controller 2 lifting handles (EP200G-HNDL-R1). 

• 

Eaton BR Series breakers, rated maximum 80A for IQ Battery and 

Enphase IQ Combiner.

• 

If breakers are required at the input or output to IQ System Controller 

2, use Eaton, Type CSR breakers rated 100 A, 125 A, 150 A, 175 A or 

200 A.

• 

Tools: conduit (with fittings and fitting tools), drill, 5/32 inch pilot bit 

(or metric equivalent), screwdriver, socket, wrench, adjustable wrench, 

torque wrench, level, 5/32 inch Allen key (or metric equivalent), 

conductor stripper, electrician’s hole saw (2 inch) kit or punch set, and 

stud finder, if installing on studs. 

• 

Conduit fittings (hubs) are required for all installations, and NEMA 

Type 3 conduit fittings (hubs) are needed when installing out of doors 

(one for each used conduit opening). 

• 

Conduit ground hub rings.

 NOTE

: Conduit entry is allowed only through the bottom or bottom sides 

of the unit.

• 

Three  #10, 1/4”, or 5/16” lag bolts or screws, 7.6cm (three inches) long 

(depending on attachment wall), for each wall-mount bracket. Check with 

a structural engineer and local standards for local requirements.

• 

Washers for use between fastener heads and wall-mount bracket.

• 

Conductors rated at 75°C. 

For sizes, refer to the table on the unit and 

to local codes.

• 

Over current protection: maximum in accordance with local standards.

• 

The door sheet metal is not required to be grounded, since it is pro-

tected from live parts by other grounded metal and insulating plastic 

materials, thus is considered unlikely to become energized.

INSTALLATION

Use the 

Enphase Installer App™

 mobile app for iOS and Android devices. It 

allows installers to configure the system while on site, eliminating the need 

for a laptop and improving installation efficiency.

NOTE: 

Only one IQ System Controller 2 can be commissioned in one 

system. Multiple IQ System Controller 2s can exist on the same site but 

they need to be in separate systems, i.e. separate Enphase App/Enphase 

Installer App activations.

       Plan a location for the IQ System Controller 2

The IQ System Controller 2 housing is NEMA type 3R and you can install it indoors 

or outdoors.

*

 

WARNING: 

Protection against lightning and resulting voltage surge 

must be in accordance with local standards.

A ) 

Follow all local codes and standards when planning for and installing 

the Enphase IQ System Controller 2.

B )  Choose a well-ventilated location where the ambient temperature 

is within -40° C to 50° C (-40° F to 122° F), preferably out of direct 

sunlight. 

C )  Ensure that the mounting location can sustain the weight of the IQ 

System Controller 2 and mounting bracket 

39.4 kg (87 lbs)

. The wall 

must include studs that can bear 

39.4 kg (87 lbs) 

or can be of masonry 

or other suitable structure that can bear the weight.

D )  Check the mounting location clearances:

• 

Indoors:  at least 15cm (six inches) off the 

ground, 15cm (six inches) from the ceiling, 

and 15cm (six inches) on each 

side.

• 

Outdoors: at least 91cm (three 

feet) off the ground and 15cm 

(six inches) on each side.

E )  Ensure that there are no pipes or 

electrical conductors where you 

plan to drill.

F )  Plan to maintain at least 90cm 

(three feet) of clearance in front 

of the IQ System Controller 2.

G )  Consider the dimensions of the 

IQ System Controller 2, easy 

access, unit height, conduit 

entry, and length of cable when 

selecting the location. 

H )  Select a location where you can 

interconnect to the site’s load 

center using the Enphase IQ 

System Controller 2.

1

width = 19.7 in.

36 in.

depth = 9.7 in.

IQ System Controller 2 

dimensions

Scenario 4:                                                      

Partial home backup with Solar 

Only backup: 

This is the preferred 

configuration for partial home 

backup with subpanel using only IQ8 

PV. Generator can be integrated with 

IQ System Controller based on the 

homeowner’s needs.

(optional)

Содержание BRK-100A-2P-240V

Страница 1: ...roviding a consistent pre wired solution for residential applications Along with MID functions it includes PV storage and generator input circuits 2021 Enphase Energy All rights reserved Enphase the Enphase logo IQ System Controller 2 IQ Battery IQ Gateway IQ combiner IQ microinverter Enphase App and other trademarks or service names are the trademarks of Enphase Energy Inc Data subject to change ...

Страница 2: ... for local requirements Washers for use between fastener heads and wall mount bracket Conductors rated at 75 C For sizes refer to the table on the unit and to local codes Over current protection maximum in accordance with local standards The door sheet metal is not required to be grounded since it is pro tected from live parts by other grounded metal and insulating plastic materials thus is consid...

Страница 3: ...w engages with the hole in the bracket to prevent vertical movement of the bracket WARNING Risk of injury and equipment damage Do not skip this step Without these screws in place the IQ System Controller 2 may fall and cause injury or damage if bumped or shaken K Use the four filler plates provided in the lit kit to cover the screws IQ System Controller 2 Wall Mount Bracket Align with stud Bracket...

Страница 4: ...tem Controller and insert quad breaker BRK 20A40A 4P 240V in the NFT position wire L1 and L2 from IQ Gateway terminals through the PV conduit to IQ System Controller wire IQ Gateway L1 and L2 and NFT L1 and L2 to the quad breaker Generator breaker position is free to be used with generator J The bottom right breaker position can be used for the below purposes 1 Power the IQ Gateway 2 Interconnect ...

Страница 5: ...DING ELECTRODE TERMINAL adjacent to the grounding bar From the lit kit place the label SUITABLE FOR USE AS SERVICE EQUIPMENT MAIN SERVICE DISCONNECT on the deadfront near the main breaker service disconnect If IQ System Controller 2 is not used as service equipment these labels should not be used E Connect Lines Neutral and Ground For details refer to the conductor table on the unit for sizes and ...

Страница 6: ...e service entrance of the the system controller The arrows on the Consump tion PCS CT must point towards the loads towards the busbar inside the IQ System Controller 2 Refer to the image on the next page for the Consumption PCS CT location and wiring to the IQ Gateway D You must protect all PCS controlled busbars and or conductors with suitably rated overcurrent devices that are appropriately size...

Страница 7: ...al Back side 20mm vertical x 20mm Horizontal Production CT CT 200 SOLID 9mm vertical x 30mm horizontal This sensor is part of a Power Control System Do not re move or disable Replace with same type and rating NOTE The maximum operating currents in controlled busbars or conductors are limited by the settings of the Power Control System PCS and may be lower than the sum of the currents of the connec...

Страница 8: ... is for connecting with a remote RSD switch It has two normal ly close auxiliary contacts NC3 NC4 and each auxiliary contact has two terminals Gen I O has one normally open auxiliary contact NO3 for generator control and this contact has three terminals All the auxiliary contact relays are rated for pilot duty at 24Vac Vdc nomi nal and 1 Amp A Auxiliary Contact connections for shedding excess PV a...

Страница 9: ...s to secure the headers to IQ System Controller 2 as shown in Feed through headers for I O 1 and I O 2 image 1 Insert the wires from the transformer controller and the external contactor into the feed through header NOTE Supports AWG 28 to AWG 16 wire sizes 2 Tighten the screws on the top torque 0 22Nm to 0 25Nm to secure the wires Follow same procedure for generator dry contact connections There ...

Страница 10: ...of generator CTs CT 200 SPLIT for L1 and L2 at the IQ System Controller 2 s Generator input terminal for power monitoring when the generator is running Detailed CT wiring is described in step 9 G Use Enphase Installer App mobile application to commission and pro gram IQ System Controller 2 to control the generator H For 2 wire autostart generators wire the Generator I O port in IQ System Controlle...

Страница 11: ...he arrow on the CT pointing towards the Generator breaker D Clamp the unmarked CT on Line 2 of the generator branch circuit inside the IQ System Controller 2 box with the arrow pointing towards the Generator breaker E Bring the CT lead wires out of IQ System Controller 2 to the standalone IQ Gateway or IQ Gateway in the IQ Combiner box F Use a screwdriver to loosen the screw on the IQ Gateway term...

Страница 12: ... to meet warranty requirements the IQ System Controller 2 must be installed and or stored according to the instructions in this guide NOTE The IQ System Controller 2 is compatible only with the IQ Combiner 4 4C fitted with USB hub USB radios and production and Consumption PCS CTs The IQ Combiner with the IQ Gateway inside is required for operation of the IQ System Controller 2 Earlier versions of ...