Warning: many of the instructions and steps
within this document require the use of tools. Only autho-
tized personnel should ever perform any maintenance
procedure on the dishmachine!
PREPARATION
1. Power must be shut off to the unit at the service
breaker. Tag or lock out the service breaker to prevent acci-
dental or unauthorized energizing of the machine.
2. Ensure that incoming water to the machine is shut
off either by use of a shut-off valve or disconnecting the
incoming water line.
3. Remove all dress panels and heater covers.
TOOLS REQUIRED
The following tools will be needed to perform this
maintenance evolution:
1. 3/8” nut driver
2.Standard Allen wrench set
TIME REQUIRED
It is estimated that it will take (1) person thirty min-
utes to perform this task, not including all of the items indicat-
ed in the section entitled “PREPARATION”.
IMPORTANT NOTES
1. Read these instructions thoroughly before
attempting this maintenance evolution. Become familiar with
the parts and what actions need to be taken. This will save
time in the long run!
STEPS
1. To convert from either single phase or three phase, first
rewire the incoming power terminal block as the drawings
below indicate.
2. When completed, the wiring of the terminal block should
reflect the phase you are wanting to convert the unit to.
3. Ensure that the wires are tightened down.
4. Wire numbers can be found on the individual wires. If this
is not the case for your machine, refer to the machine
schematic or contact Jackson Technical service.
5. Next the wash heater needs to be rewired to accomodate
the new phase. Ensure that you have removed the heater
cover(s) and have exposed the wash heater.
6. Remove the nuts holding the wires to the heater and rewire
the heater in accordance with the drawings found on the next
page for the applicable phase.
7. Ensure that the wires are tightened down. Extra or neces-
sary jumpers can be found in your conversion kit.
Tempstar LT/NB/S/SDS Technical Manual 7610-011-86-35
Issued: 06-26-2006 Revised: N/A
SECTION 5: SERVICE PROCEDURES
TEMPSTAR PHASE CONVERSION INSTRUCTIONS
25
9 10 BLK
11 12 RED
1 2
3 4
L1
L1
L2
L3
L2
SINGLE PHASE WIRING
THREE PHASE WIRING
BLK
1 9
2 10
3 11
RED
4 12
TERMINAL BLOCK
WIRING
Содержание TEMPSTAR
Страница 2: ......
Страница 7: ...1 SECTION 1 SPECIFICATION INFORMATION ...
Страница 14: ...8 SECTION 2 INSTALLATION OPERATION INSTRUCTIONS ...
Страница 19: ...13 SECTION 3 PREVENTATIVE MAINTENANCE ...
Страница 21: ...15 SECTION 4 TROUBLESHOOTING SECTION ...
Страница 24: ...18 SECTION 5 SERVICE PROCEDURES ...
Страница 38: ...32 SECTION 6 PARTS SECTION ...
Страница 78: ...72 SECTION 7 ELECTRICAL SCHEMATICS ...