![Engcon EC204 Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/engcon/ec204/ec204_user-manual_2412299036.webp)
6 Maintenance
6. Maintenance
6.1. General
Intervals for greasing and inspections to be performed by the user:
- Daily, carried out on all configurations before the machine is put into use for the working
day.
- Every 8 operating hours, lubrication as per lubrication schedule.
- Every 250 operating hours; see section 6.5. Service every 250 operating hours.
In addition to these inspections, a delivery/initial inspection must be carried out by a
specialist after no more than 500 operating hours, and then every 2000 operating hours
1st year service as per section 11.1. Service schedule.
Complete the service record, section 11.2. Service record, following each service.
DANGER
Check the attachment points regularly and be alert for
the formation of cracks. Risk of personal injury and
damage to property.
WARNING
Make sure that service and maintenance is carried out
according to the manufacturer's recommendations.
Inadequate maintenance may cause defects on the
base machine and its equipment.
WARNING
When changing hoses, only hoses with press
couplings may be used. Screw connections may
not be used. Risk of personal injury and damage to
property.
WARNING
Make sure the locking cylinder is in its maximum
extended position before removing the locking hook.
Risk of injury and damage to property.
36
Содержание EC204
Страница 65: ...11 Service Date 500 h 250 h 2000 h Remark Action Stamp Signature 65...
Страница 66: ...11 Service Date 250 h 2000 h Remark Action Stamp Signature 66...
Страница 67: ...11 Service Date 250 h 2000 h Remark Action Stamp Signature 67...
Страница 68: ...engcon Uk Ltd 200B Ashchurch Business Centre Tewkesbury GL20 8TD 44 1684 297168 uk engcon com www engcon com...