![Engcon EC204 Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/engcon/ec204/ec204_user-manual_2412299023.webp)
5 Operation
5.2. Lifting points
Approved
Not approved
Figure 12.
Figure 13.
Figure 14.
Check max permitted load for the lifting hook, as stamped on the lifting hook and rating
plate. Designed with safety factor 5:1.
WARNING
The base machine must be equipped with a load-
holding valve on the boom/stick and an overload
warning when using a lifting hook on the tiltrotator.
Risk of personal injury and damage to property.
5.3. Integrated grab
The grab is not designed for lifting with chains, straps or similar.
WARNING
Use dedicated lifting equipment when lifting objects.
Risk of personal injury and damage to property.
WARNING
Do not use the grab for work using directional forces,
e.g. piling. Risk of personal injury and damage to
property.
23
Содержание EC204
Страница 65: ...11 Service Date 500 h 250 h 2000 h Remark Action Stamp Signature 65...
Страница 66: ...11 Service Date 250 h 2000 h Remark Action Stamp Signature 66...
Страница 67: ...11 Service Date 250 h 2000 h Remark Action Stamp Signature 67...
Страница 68: ...engcon Uk Ltd 200B Ashchurch Business Centre Tewkesbury GL20 8TD 44 1684 297168 uk engcon com www engcon com...