A
HE, DE & RE MANUAL
IOM-26
2 of 33
Oct 12 R4
TABLE OF CONTENTS
PIPING, ELECTRICAL OR CONTROL SERVICE CONNECTIONS
......................................................................................12
NATURAL GAS AND PROPANE INSTALLATION:
GAS LINE TESTING (EXTERNAL TO THE UNIT)
NON RECIRCULATING INSTALLATION REQUIREMENTS
..................................................................................................13
DE PROCESS HEATER INSTALLATION REQUIREMENTS
.................................................................................................15
EXHAUST FAN / RELIEF AIR PROVISIONS
Recommended 24V Field Wiring Size: ........................................................................................................................... 17
DUCT MOUNTED TE-6000-EA3 TEMPERATURE SENSOR
................................................................................................18
FLUSHING AND DEGREASING OF WATER AND GLYCOL COILS
....................................................................................19
BEFORE START-UP ...................................................................................................................................................... 20
START-UP CHECK LIST ................................................................................................................................................ 20
OPERATION
SAFETY SHUTOFF VALVE LEAK TEST:
LUBRICATION OF DODGE FAN BEARINGS
OUTDOOR AIR INTAKES, MIXING SECTIONS AND DAMPERS
.........................................................................................33
© Airtex Manufacturing Partnership. All rights reserved.