 LIFTING 

 
Engineered Air units are constructed on a structural steel base frame. The unit base frame is equipped with 
lifting lugs specifically located to facilitate proper lifting of the unit. Spreader bars must be used to keep 
rigging away from the unit cabinetry. All lifting lugs must be used. If using a lift truck, ONLY lift using the 
perimeter structural frame. DO NOT allow forks to lift on cabinet or unit floor.  
Note:  There may be bottom mounted components, such as drain piping, that can be easily damaged. 
 

Warning:

 

Injury or death can result from improper rigging and lifting.  Rigging and 
lifting of equipment must be performed by qualified personnel with proper 
equipment using appropriate and approved safety precautions.

 

 

MOUNTING 

 
Units must be mounted level. Failure to do so can cause water to be trapped in drain pans or operational 
problems that can void warranty.  Failure to do so can result in injury or death, damage the equipment 
and/or building and can be a cause of poor indoor air quality. 
 
Equipment must be installed so that sufficient working clearance and component access is provided.  
Some units are designed for cantilevered installation.  Consult the Submittal Record for specific unit 
mounting. 
 
Consult the Submittal Record for specific unit mounting.  Engineered Air units are constructed for three 
types of mounting:  
 
1. 

Base mounting 

– Consult the Submittal Record for type of mounting.  Unless the unit is specifically 

designed for point or other mounting, the base of the unit must be supported continuously by a 
mounting support system that is directly below the unit structural base frame and runs the entire 
length and width of the 

unit.  Refer to the Submittal Record for mounting information.  Units 100” 

(2500mm) wide and under can be supported on each side continuously along the length of the unit.  
As a minimum, sleepers that are installed perpendicular to the length of the unit must be continuous 
across the width of the unit and shall be installed at the end lifting point base rails and the lesser of 
80” (2000mm) on center or at all lifting points. 

 
2. 

Suspended mounting 

– Where units have been designed for suspended mounting, factory provided 

connections for hanger rods will be provided. All hanger rod supports must be used. Suspended 
units must be protected from damage.   When installed in aircraft hangers, parking garages or 
repair garages the installation must comply where applicable with: 

 

a)  The Canadian Natural Gas and Propane Installation Code, C.S.A. Standard B149.1 
b)  The Standard on Aircraft Hangers, ANSI/NFPA 409 
c)  The Standard on Parking Garages, ANSI/NFPA 88A 
d)  The Standard on Repair Garages, ANSI/NFPA 88B 

 

Содержание ENGINEERED AIR DE Series

Страница 1: ...EAD OFFICE AND FACTORY CANADIAN EASTERN FACTORY 1401 HASTINGS CRES SE CALGARY ALBERTA T2G 4C8 Ph 403 287 2590 Fx 888 364 2727 Parts 32050 W 83 rd STREET DESOTO KANSAS 66018 Ph 913 583 3181 Fx 913 583...

Страница 2: ...T FREEZE PROTECTION 16 ELECTRICAL INSTALLATION 16 Recommended 24V Field Wiring Size 17 DUCT MOUNTED TE 6000 EA3 TEMPERATURE SENSOR 18 COIL CONNECTIONS 18 DRAIN TRAPS 19 FLUSHING AND DEGREASING OF WATE...

Страница 3: ...inning the installation including all safety precautions and warnings FOR YOUR SAFETY If you smell gas 1 Open windows 2 Don t touch electrical switches 3 Extinguish any open flame 4 Immediately call y...

Страница 4: ...S Do not try to light any appliance Do not touch any electrical switch do not use any phone in your building Leave the building immediately Immediately call your gas supplier from a phone remote from...

Страница 5: ...warranties express or implied ENGINEERED AIR specifically disclaims any implied warranty of merchantability and or fitness for purpose Under no circumstances shall ENGINEERED AIR be liable to nor be r...

Страница 6: ...be internal damage Remove protective covers and check for internal damage Replace covers if the unit is not being assembled or installed at this time Open access doors and check for internal damage Cl...

Страница 7: ...n of the Canadian Electrical Code Part 1 C S A Standard C22 1 Provincial and Local Codes and in accordance with the local authorities having jurisdiction 3 The installation of this unit shall be in ac...

Страница 8: ...dance with local authorities having jurisdiction or NFPA 54 an accessible approved manual shutoff valve shall be installed within 6 ft 1 8 m of the valve train gas manifold 6 The installation of this...

Страница 9: ...ic unit mounting Consult the Submittal Record for specific unit mounting Engineered Air units are constructed for three types of mounting 1 Base mounting Consult the Submittal Record for type of mount...

Страница 10: ...he gasket material for splits is open cell foam It is less dense than the closed cell foam and compresses easily ONLY USE THE CLOSED CELL FOAM GASKET PROVIDED FOR SEALING THE CURB Curbs may be broken...

Страница 11: ...rial for sealing the curb The gasket material for curbs is closed cell foam It is more dense than open cell foam and does not compress as easily ONLY USE THE OPEN CELL FOAM GASKET PROVIDED FOR SEALING...

Страница 12: ...pply pressure higher than the unit rating plate requires an additional field supplied gas regulator 5 Install an approved appliance shutoff valve on the gas supply in accordance with the requirements...

Страница 13: ...within 20 ft 6 m horizontally of the vertical plane in which combustible gas vapor or dust is present This equipment shall be installed so that in the event the make up air shut down causes a hazard...

Страница 14: ...ion air must be provided in accordance with the information shown on the name plate Recirculation of room air in HE DE RE units may be hazardous in the presence of A Flammable solids liquids and gases...

Страница 15: ...jurisdiction if there is airborne particulate matter that could be detrimental to the operation of the heater If airborne particulate matter could accumulate in the duct system in the re circulating...

Страница 16: ...ally grounded and all wiring must be installed in accordance with the National Electrical Code ANSI NFPA 70 and or the Canadian Electric Code CSA 22 1 and to the approval of the authorities having jur...

Страница 17: ...15 12 AWG Notes 1 The field wiring load depends on the actual load on a particular control circuit the field wiring is connected to Refer to the internal wiring diagram of the unit 2 The table above i...

Страница 18: ...refrigerant coils For proper operation airflow must be counterflow to the flow of the fluid The inlet water connection is normally at the bottom of one header and the outlet water connection at the to...

Страница 19: ...nnected and properly trapped Cooling coil drain pans may have multiple drain connections extending outside the unit casing Multiple drains may be connected to a common drain providing that each drain...

Страница 20: ...contains moving parts that can start unexpectedly Injury or death could occur if instructions are not followed All work should be performed by a qualified technician Always disconnect and lock out pow...

Страница 21: ...is less than 2 and therefore is OK If voltage imbalance is greater than two percent 2 turn off main disconnect and contact the installing electrical contractor to have the voltage condition corrected...

Страница 22: ...re the air volume being delivered matches the unit rating plate Failure to perform a proper air balance can cause injury or death damage to the equipment property damage system operational problems or...

Страница 23: ...e rate is less than noted in the table remove the 6mm tube reconnect the outlet pressure tap plug 8 Energize the control system and open upstream manual gas valve 9 After testing check all piping conn...

Страница 24: ...the problem For example a lockout will occur if the air pressure switches are not made Refer to separate trouble shooting guide for additional information Also check spark rod and flame rod to see if...

Страница 25: ...iring close the main manual firing valve and the pilot firing valve The automatic valves should close within 4 seconds and the flame ignition control should lock out within 10 to 15 seconds To return...

Страница 26: ...l growth or any other indoor air quality issues If mold or biological growth is present determine and fix the cause Properly remove and dispose of the contamination Properly clean and sanitize the aff...

Страница 27: ...in the pulleys the V belt does not have to be extremely tight It should be as loose as possible without slipping in the pulley grooves Belt deflection 3 4 19mm for each foot 300mm of span between the...

Страница 28: ...in lb 26 31 Nm 2 7 16 62mm 147 in lb 16 6 Nm 155 in lb 17 5 Nm 228 272 in lb 26 31 Nm 2 11 16 68mm 173 in lb 19 6 Nm 248 in lb 28 0 Nm 228 272 in lb 26 31 Nm 2 15 16 75mm 173 in lb 19 6 Nm 248 in lb 2...

Страница 29: ...inhibitors antioxidant additives and a minimum viscosity of 500 SSU at 100 F 38 C Some examples of grease having these properties are Shell Alvania RL 2 Mobil Mobilith SHC220 Exxon Ronex MP Lubricate...

Страница 30: ...tion temperature and surrounding conditions will affect the re lubrication frequency required Clean and repack bearing annually Remove old grease pack bearing full and fill housing reservoirs on both...

Страница 31: ...29 8 kW Over 40 HP Over 29 8 kW Less than 12 5 Years 3 Years 1 5 Years More than 12 2 Years 1 Year 9 Months NOTE Motors that run in severe conditions should be greased as specified by the motor manufa...

Страница 32: ...rost or snow Plugged or excessively dirty filters can cause damage to the equipment See submittal record for filter quantities sizes and types Use same size and type for replacement A High Velocity Pe...

Страница 33: ...lure to maintain clean coils can cause injury or death damage to the equipment property damage or system operational problems Moisture carry over can result from dirty coils The external surface of fi...

Отзывы: