
9
171 635 04 05-01
03. INSTALLATION
Acceptance inspection
Ensure that everything is delivered and that there is no transport damage.
If there is anything wrong with the delivery, please report it to the supplier.
Any transport damage should be reported to the forwarding company.
Preparations for installation
Ensure that the size and capacity range of the burner are suitable for the
boiler. Power data on the data plate refer to the minimum and maximum
power of the burner.
Distribution of oil
To ensure satisfactory operation it is essential that the oil distribution sys-
tem is correct.
Observe the following:
- See Pump instructions for choice of tube diameter, tube length and height
difference.
- Fix the tubing with a minimum number of screw fittings.
- Fix the tubes so that the oil hoses are not subjected to tensile stress or
sharp bending when swinging out the burner or removing it for service.
- Fit the oil filter so that the filter cartridge can easily be replaced, see Oil
filter Bentone.
Electrical connections
The main power switch must be turned off before beginning the electrical
installation. If the boiler has a 7-pole contact device type Eurostecker it will
most often fit the burner direct. Otherwise use the accompanying contact
device. The operating thermostat and maximum thermostat, and also any
fire-door switch, can then be connected in series with the incoming phase
or be connected between T1 and T2. In the first case T1 and T2 are to be
strapped.
If another electrical connection is used than the one recommended by
Bentone, there might be a risk of material damage or personal injury.
Choice of nozzle
See under Technical Data: Recommended nozzle and table of nozzles.
Setting of the shrouded disc and air flow
The burner is pre-set on delivery in relation to the nozzle provided. If the
size of the nozzle is changed the burner can be initially set according to
“Basic settings”. Note that it is only a question of a basic setting that
should be trimmed when the burner is started. This should include a flue
gas analysis and measurement of soot.
V
!
Warning
Содержание Bentone B2S Classic
Страница 2: ......
Страница 4: ......
Страница 18: ...18 171 855 18 04 01 09 ELECTRICAL EQUIPMENT LOA24 Wiring diagram 1 2 1 2...
Страница 22: ......
Страница 23: ......
Страница 24: ...Enertech AB P O Box 309 SE 341 26 Ljungby www bentone se www bentone com...