
19
171 855 18 04-01
2(2)
09. ELECTRICAL EQUIPMENT LOA24...
List of components
A1
Oil burner control
R1
Photoresistor
A2
Twin thermostat
S3
Main switch
F1
Fuse, max. 10A
T1
Ignition transformer
H1
Alarm lamp
Y1
Solenoid valve
H2
Signal lamp (optional)
X1
Plug-in contact, burner
M1 Burner motor
X2
Plug-in contact, boiler
P1
Time meter (optional)
Mains connection and fuses in accor-dance with local regulations.
Function
1. Switch on operating switch and twin thermostat
The burner motor starts, an ignition spark is formed, the prepurge goes
on till the prepurge period expires and the solenoid valve opens (2).
2. Solenoid valve opens
Oil mist is formed and ignited. The photocell indicates a flame.
(1)
The ignition spark goes out 15 s. after flame indication
(LOA24.171...)
.
(2)
The ignition spark goes out 2 s. after flame indication when the ignition
transformer is connected to terminal 7
(LOA24.173...)
.
3. The safety time expires
a.
If no flame is established before this time limit the control cuts out.
b.
If for some reasons the flame disappears after this time limit, the
burner will make an attempt to re-start.
3-4. Operating position
If the burner operation is interrupted by means of the main switch or the
thermostat, a new start takes place when the conditions in accordance
with point 1 are fulfilled.
The oil burner control cuts out
A red lamp in the control is lit. Press the reset button and the burner
re-starts.
Post-ignition
(2)
If a post-igniton of 15 s. is wanted, move the ignition transformer from
terminal 7 to terminal 6
(LOA24.173...)
.
Technical data
Pre-ignition time:
13 s
Pre-purge time:
13 s
(1)
Post-ignition time:
15 s
(2)
Post-ignition time:
2 s
Safety lock-out time:
10 s
Reset time after lockout:
» 50 s
Reaction time on flame failure:
max. 1 s
Ambient temperature:
from - 20 to +60°C
Min. current with flame established:
65 µ A
Max. photo current at start:
5 µ A
Enclosure:
IP 40
(Under voltage proof only LOA24...)
Control of photo current
Current through photo unit is measured with a d.c. ammeter (a moving coil
instrument connected in series with the photo unit).
Outer electrical connection
* If there is no plug-in contact (X2) on
the boiler, connect to the contact
enclosed. In case the twin thermo-
stat is in series on incoming phase
L1, a loop between the terminals
T1 and T2 is necessary.
X1
X2
Содержание Bentone B2S Classic
Страница 2: ......
Страница 4: ......
Страница 18: ...18 171 855 18 04 01 09 ELECTRICAL EQUIPMENT LOA24 Wiring diagram 1 2 1 2...
Страница 22: ......
Страница 23: ......
Страница 24: ...Enertech AB P O Box 309 SE 341 26 Ljungby www bentone se www bentone com...