background image

22

Содержание Bentone B1FUV Classic

Страница 1: ...Providing sustainable energy solutions worldwide 178 066 31 3 2017 10 09 Installation and maintenance instruction B1FUV CLASSIC...

Страница 2: ...______________8 5 1 Suspension of burner ____________________________________ 8 5 2 Removing the blast tube__________________________________ 8 5 3 Shrouded disc ______________________________________...

Страница 3: ...stor 4 Test nipple fan pressure 5 Frame 6 Blast tube 7 Control box 8 Electric contact X1 X2 see wiring diagram 9 Ignition transformer 10 Oil pump 11 Motor 12 Air adjustment 13 Adjustment of nozzle ass...

Страница 4: ...oil ire or personal injury is avoided Care should be taken by the installer to ensure that no electrical cables or fuel gas pipes are trapped or damaged during installation or service maintenance Cond...

Страница 5: ...0 bar 11 bar 12 bar Gph kg h kW kg h kW kg h kW kg h kW kg h kW 0 40 1 15 13 6 1 22 14 4 1 28 15 2 1 35 16 0 1 41 16 7 0 45 1 35 16 0 1 43 17 0 1 51 17 9 1 58 18 8 1 65 19 6 0 50 1 57 18 6 1 67 19 8 1...

Страница 6: ...ain power switch must be turned off before beginning the electrical installation If the boiler has a 7 pole contact device type Eurostecker it will most often it the burner direct Otherwise use the ac...

Страница 7: ...25 30 35 40 45 0 45gph 0 50gph 0 55gph 0 60gph 0 65gph 0 75gph 0 85gph Pump pressure bar Burner capacity kW Nozzle assembly scale 0 2 4 6 8 10 12 14 15 20 25 30 35 40 45 Suction plate 4 Suction plate...

Страница 8: ...s one turn 2 Turn to the right and withdraw the blast tube Shrouded disc The preheater plug and the electrodes shall be placed on either side of the oil tube The hole in the shrouded disc shall be pla...

Страница 9: ...f the burner If the spark hits the metal the eficiency will be lower and will also cause radio disturbance There is also a risk that carbonisation will occur Since the electrode pack is of the factory...

Страница 10: ...nd air according to the recommendations in section Basic set tings For the individual boiler installation adjustments can then always be made to optimise economy operational reliability and environmen...

Страница 11: ...from the stud bolt Pull the electric package backwards and rotate it ca 90 clockwise When required the electric package can be suspended in the cables Pump lter When changing pump ilter see chapter 0...

Страница 12: ...a one pipe system In two pipe systems the pump is automatically vented by the return pipe Changing cartridge lter Unscrew the ilter screw from the cover using a 4 mm Allen key and pull out the ilter...

Страница 13: ...set on the control valve P1 and by the size of the oil nozzle in the nozzle line The control valve P1 operates as follows When the oil attains opening pressure the port to the return side opens The d...

Страница 14: ...dividual resistances is negligible The tables do not include any lengths exceeding 100 m because experience shows that longer lengths are not needed The tables apply to standard fuel oil of normal com...

Страница 15: ...in switch T1 Ignition transformer Y1 Solenoid valve X1 Plug in contact burner X2 Plug in contact boiler The colours of the preheater cable A Blue B Brown C Black Outer electrical connection Mains conn...

Страница 16: ...t 3 4 Operating position If the burner operation is interrupted by means of the main switch or the thermostat a new start takes place when the conditions in accordance with point 1 are fulilled The oi...

Страница 17: ...caused the problem by pressing and holding the reset button for 3 seconds The number of lashes below is repeated with a pause in between 2 lashes No lame signal when safety time expires 4 lashes Fals...

Страница 18: ...r runs to lockout Fuse has blown Appliance thermostat has not reset Appliance overheat device has operated Control relay or photocell defective No oil being delivered Excessive lue draught is preventi...

Страница 19: ...19 9 DECLARATION OF CONFORMITY...

Страница 20: ...t start Press the reset button on the relay Check that the thermostats are correctly adjusted Don t forget the room thermostat check that any fusesare intact and main switch is on If the burner starts...

Страница 21: ...21...

Страница 22: ...22...

Страница 23: ...23...

Страница 24: ...Enertech AB P O Box 309 SE 341 26 Ljungby www bentone se www bentone com...

Отзывы: