a.) Phase Sequence: Site engineer can check the phase sequence
of input voltage supply. Meter consider
10th terminal as reference. For correctly
measurement of phase sequence following
condition must meet
1. R Phase voltage input must be connected
at 10th terminal of the meter.
2. In case of delta configuration, All of 3
phase must be connected.
Sample screen for some possibilities is
depicted below
Let it be a case of star (3P4W) configuration. As seen
from the connections, phase sequence is R, B & Y. This
same thing can be seen on display under diagnosis
para meters, As seen in sample screen, phase
sequence is R B Y. (R phase is not shown as it is
taken as reference.)
Let it be a case of delta (3P3W) configuration. As seen
from the connections, phase sequence is R, Y & B. This
same thing can be seen on display under diagnosis
para meters, As seen in sample screen, phase
sequence is R Y B. (R phase is not shown as it is
taken as reference.)
If network is configured as Single phase, then phase
sequence doesn’t matter and meter start showing
“----”.
1 2
3
4
5 6 7
8 9
10 11 12 13 14 15 16 17 18
Voltage inputs 80 = 480VAC LL
Current Input: 50mA to 60A
Ph N
Aux. Sup.
90-300V, 2VA
RS485
DANGER
Turn off power before working
R CT
Y CT
B CT
RS485
V1 V2 V3 Vn
+
-
1 2
3
4
5 6 7
8 9
10 11 12 13 14 15 16 17 18
Voltage inputs 80 = 480VAC LL
Current Input: 50mA to 60A
Ph N
Aux. Sup.
90-300V, 2VA
RS485
DANGER
Turn off power before working
R CT
Y CT
B CT
RS485
V1 V2 V3 Vn
+
-
1 2
3
4
5 6 7
8 9
10 11 12 13 14 15 16 17 18
Voltage inputs 80 = 480VAC LL
Current Input: 50mA to 60A
Ph N
Aux. Sup.
90-300V, 2VA
RS485
DANGER
Turn off power before working
R CT
Y CT
B CT
RS485
V1 V2 V3 Vn
+
-
1 2
3
4
5 6 7
8 9
10 11 12 13 14 15 16 17 18
Voltage inputs 80 = 480VAC LL
Current Input: 50mA to 60A
Ph N
Aux. Sup.
90-300V, 2VA
RS485
DANGER
Turn off power before working
R CT
Y CT
B CT
RS485
V1 V2 V3 Vn
+
-
Page 16
Must connect R phase Voltage
input at this terminal
LCD
LCD
LCD
Series
Series
Series
ENERSOL
ENERSOL
ENERSOL
MFLR09
MFLR09
MFLR09
PROG
PROG
PROG
COM
COM
COM
Phase Sq.: BPH
Phase Sq.: YPH
Phase Sq.: ---
YPH
BPH
---
Содержание MFLR09
Страница 1: ...User Manual MFLR09 Energy Meter...