EPA Series -
Installation and Operation Manual
10
EnerPro Boiler-EPA Series-
IOM
2.1 Start-up
Initial start-up
The heating contractor must perform the initial start-up
and explain the operation of the system. The operation of
the boiler control must also be explained to the system
operator/ultimate owner by the heating contractor. Refer
to literature packaged with boiler control.
Necessary preparations prior to initial start-up, your
contractor will:
1. Check for water on the floor from the discharge
pipe or the pressure relief valve or any other pipe
joint, valve or air vent. If pressure relief valve is
discharging, the contractor will locate the source of
the problem and take corrective measures. Never cap
or plug end of pressure relief valve discharge pipe.
Ensure correct system (water) pressure.
2. Ensure fresh combustion air supply vents to boiler room
are open and unobstructed. Nothing must obstruct the
flow of combustion and ventilation air.
3. Open main fuel supply valve.
4. Activate the system. Ensure power supply is activated
and then activate system power switch.
Operation
Refer to “Lighting and operation instructions”. The boiler
control regulates operation of the heating system automatically
in conjunction with the indoor/outdoor control and any
programmed settings (if applicable). Changes to the
settings or programming can be made according to separate
instructions provided with the boiler control.
For optimum operation
2.2 Shut-down
Shut-down procedure
1. Close main fuel supply valve.
2. Deactivate system power switch.
3. Deactivate main power supply to boiler and control.
We recommend that you contact your heating contractor
Prior to and after an extended shut-down period. In this
manner, the appropriate precautions, i.e. system freeze-up
protection or heat exchanger maintenance, can be taken.
Warning
Do not attempt to start the burner if excessive fuel has
accumulated in the combustion chamber. Do not open the
boiler door or clean outs when the boiler is hot.
2. Start-Up & Shut-Down Procedures
Keep the boiler and the boiler room clean and free of dust
and dirt.
Ensure proper system pressure by occasionally checking
pressure gauge.
Allow a qualified heating contractor to regularly service
and maintain your heating system.
Neglected maintenance impacts on product warranty; regular
cleaning and maintenance ensures clean, environmentally
friendly and efficient operation.
We recommend a maintenance contract with a qualified
heating contractor.
If you require assistance finding a qualified heating
contractor, please contact your local Sales Representative
or EnerPro Boilers.
Содержание EPA1050
Страница 19: ...EPA Series Installation and Operation Manual 19 EnerPro Boiler EPA Series IOM 6 AC ELECTRICAL POWER WIRING A A...
Страница 39: ...EPA Series Installation and Operation Manual 39 EnerPro Boiler EPA Series IOM 10 Electrical Drawings...
Страница 40: ...EPA Series Installation and Operation Manual 40 EnerPro Boiler EPA Series IOM...
Страница 41: ...EPA Series Installation and Operation Manual 41 EnerPro Boiler EPA Series IOM...
Страница 42: ...EPA Series Installation and Operation Manual 42 EnerPro Boiler EPA Series IOM...
Страница 43: ...EPA Series Installation and Operation Manual 43 EnerPro Boiler EPA Series IOM...
Страница 44: ...EPA Series Installation and Operation Manual 44 EnerPro Boiler EPA Series IOM...
Страница 45: ...EPA Series Installation and Operation Manual 45 EnerPro Boiler EPA Series IOM...
Страница 46: ...EPA Series Installation and Operation Manual 46 EnerPro Boiler EPA Series IOM...
Страница 47: ...EPA Series Installation and Operation Manual 47 EnerPro Boiler EPA Series IOM...
Страница 48: ...EPA Series Installation and Operation Manual 48 EnerPro Boiler EPA Series IOM...
Страница 52: ...EPA Series Installation and Operation Manual 52 EnerPro Boiler EPA Series IOM...
Страница 57: ...EPA Series Installation and Operation Manual 57 EnerPro Boiler EPA Series IOM...