The QuadGuard cz may be installed on any of the following
Foundations using the specified anchorage:
Foundation A: Concrete Pad or Roadway
Foundation: 150 mm [6"] minimum depth
Portland Cement Concrete (P.C.C.)
Anchorage: MP-3
®
with 180 mm [7"] studs
140 mm [5.5"] embedment
Foundation B: Asphalt over P.C.C.
Foundation: 75 mm [3"] minimum Asphalt Concrete
(A.C.) over 75 mm [3"] minimum (P.C.C.)
Anchorage: MP-3 with 460 mm [18"] studs
420 mm [16.5"] embedment
Foundation C: Asphalt over Subbase
Foundation: 150 mm [6"] minimum (A.C.) over
150 mm [6"] minimum Compacted Sub-
base (C.S.)
Anchorage: MP-3 with 460 mm [18"] studs
420 mm [16.5"] embedment
Foundation D: Asphalt Only
Foundation: 200 mm [8"] minimum (A.C.)
Anchorage: MP-3
with 460 mm [18"] studs
420 mm [16.5"] embedment
Foundation Specifications
for Foundations A, B, C and D mentioned above
A. C. ( Asphalt Concrete )
AR-4000 A. C. (per ASTM D3381 '83) .75" Maximum,
Medium (Type A or B) aggregate
Sieve Size
Operating Range (%)Passing
1"
100
3/4"
95-100
3/8"
65-80
No. 4
49-54
No. 8
36-40
No. 30
18-21
No. 200
3-8
P.C.C. ( Portland Cement Concrete )
Stone aggregate concrete mix
4000 psi minimum compressive strength
(Sampling per ASTM C31-84 or ASTM C42-84a, test-
ing per ASTM C39-84)
C.S. ( Compacted Subbase )
150 mm [6"] minimum depth 95% compaction
Class 2 aggregate
Sieve Size
Moving Average % Passing
3"
100
2 1/2"
90-100
No. 4
40-90
No. 200
0-25
Figure 4
PCMB Anchored To Roadway
Bidirectional Sites
Bidirectional Sites
Bidirectional Sites
Bidirectional Sites
Bidirectional Sites
At bidirectional sites, the rear of the system must be either
offset away from the traffic approaching from rear of the
system or be installed with a Transition Panel to prevent
snagging of vehicles (see
Figure 45 on page 26 for maxi-
mum gap). The Transition Panels are depicted on page 9.
If attaching to portable concrete barrier (PCMB) the last sec-
tion of barrier must be anchored to the roadway (see Fig-
ure 4 and drawings supplied with your system). Anchor
Brackets are available from Energy Absorption Systems, Inc.
Note:
Walk-up inspections are recommended at least
once every six months for installations on asphalt.
Installation (cont’
Installation (cont’
Installation (cont’
Installation (cont’
Installation (cont’d.)
d.)
d.)
d.)
d.)
Содержание QuadGuard cz
Страница 46: ...QuadGuard cz 46 Notes Notes Notes Notes Notes ...
Страница 47: ...47 QuadGuard cz Notes Notes Notes Notes Notes ...