2) To Move the System:
1. Verify monorail sections are bolted together.
2. Attach two lifting brackets each on diaphragms
listed (four brackets total). See Figure 50.
3. Minimum sling length 3 meters (9 ft). Use fixed
equal length slings.
4. Free the system from anchor bolts & grout prior
to lifting the system. To accomplish this, start at
the nose of the system and use pry bars to gradu-
ally raise the system off of the studs. Place blocks
such as 2X4's under the monorail and work down
the length of the system until the system is com-
pletely free of the studs.
5. Lift the system to new location.
6. Replace all damaged parts.
7. Re-anchor system.
ANCHOR SYSTEM FOR PROPER IMPACT PER-
FORMANCE.
Use MP-3 polyester anchor system,
supplied by Energy Absorption Systems, or ap-
proved equal. The QuadGuard cz installed on as-
phalt must be inspected to ensure the anchors
are still properly set following each impact. Re-
anchor as necessary. See drawing 35-40-06.
Mo
Mo
Mo
Mo
Moving the S
ving the S
ving the S
ving the S
ving the System (cont'd.)
ystem (cont'd.)
ystem (cont'd.)
ystem (cont'd.)
ystem (cont'd.)
Содержание QuadGuard cz
Страница 46: ...QuadGuard cz 46 Notes Notes Notes Notes Notes ...
Страница 47: ...47 QuadGuard cz Notes Notes Notes Notes Notes ...