QuadGuard
®
cz
14
QuadGuard cz (with plate)
QuadGuard cz (with plate)
QuadGuard cz (with plate)
QuadGuard cz (with plate)
QuadGuard cz (with plate)
4) Anchor the System
Note: Cross slope of plate shall not exceed 8% and
not vary (twist) more than 2% from front to back.
For these conditions, a leveling pad is required.
See Figure 20.
8% SLOPE
MAX.
Figure 20
Max. Allowable Cross Slope
Figure 21
Anchoring the System
SOIL
3/4" DIA. MP-3
THREADED ROD SYSTEM
QUADGUARD CZ SYSTEM
MIN. 483mm [19"] TYP.
ROADWAY EDGE
C - ASPHALT*
D - REINFORCED P.C. CONCRETE*
OR E - COMPACTED SUBBASE*
*MATERIALS:
C - ASPHALTIC CONCRETE
•
ASPHALT BINDER AR-4000
•
ASPHALT AGGREGATE 3/4
(19mm) MAX. MED A B
D - 28 MPa [4000 PSI] P.C. CONCRETE
E - SUBBASE PREPARED AS COMPACTED
•
CLASS 2
•
95% COMPACTION MIN. LAYER
Depth Combinations
Note:
Walk-up inspections are recommended at least
once every six months for installations on asphalt.
Note: 18" Anchors are supplied with the QuadGuard cz.
If another substrate is encountered, please call Customer
Service to discuss options.
Req’d Stud Length
E
D
C
180 mm [7"]
--
150 mm [6"]
--
460 mm [18"]
--
75 mm [3"]
75 mm [3"]
--
--
--
150 mm [6"]
460 mm [18"]
460 mm [18"]
Installation (cont’
Installation (cont’
Installation (cont’
Installation (cont’
Installation (cont’d.)
d.)
d.)
d.)
d.)
Use MP-3 Polyester Anchoring System supplied by
Energy Absorption Systems, Inc. or approved equal.
QuadGuard czs installed on asphalt must be inspected
to ensure the anchors are still properly set following
each impact. Re-anchor as necessary.
Use the Plate/Monorail sections as a template to drill
anchor holes. Refer to figure 21 and instructions con-
tained in the MP-3 Polyester Anchor box supplied with
the system for detailed anchoring instructions.
150 mm [6"]
200 mm [8"]