
DOC-8240 Rev. 3
EQ-9-HP Operation Manual
15
C h a p t e r 3
INSTALLATION
Unpacking
Upon arrival, start by inspecting all parts of the system for completeness and any damage
incurred in shipping. The EQ-9-HP shipping box should contain:
1) EQ-9-HP Power Supply Controller unit
1) EQ-9-HP Lamp House unit
1) Black interconnecting cable from Lamp House to Power Supply Controller (21-
pin mixed D-sub).
OPTIONAL
1) EQ-99-RC Remote Control Module with interlock connector
1) I/O cable with 15 pin D- connector at each end
1) DC power supply with custom connector
If any part is missing or appears damaged, contact Energetiq immediately. Do not attempt to
substitute any parts. There are no user-serviceable parts inside the EQ-9-HP Lamp House or
Power Supply Controller unit.
Connections
Installation of the EQ-9-HP consists of connecting electrical and optional gas supplies, and
connecting the Lamp House
module to the user’s equipment.
Electrical Power
The EQ-9-HP requires 12VDC at 11.7A minimum (140W rating). Power consumption is
approximately 100W during normal operation. Some OEM versions have higher current
requirements.
Содержание LDLS EQ-9-HP
Страница 3: ......
Страница 21: ...DOC 8240 Rev 3 EQ 9 HP Operation Manual 17 ...
Страница 23: ...DOC 8240 Rev 3 EQ 9 HP Operation Manual 19 Figure 7 Power Supply Controller mechanical layout ...
Страница 34: ...30 EQ 9 HP Operation Manual DOC 8240 Rev 3 ...
Страница 36: ......