7
COLUMN 1
Time Zone 1
COLUMN 2
Time Zone 2
COLUMN 3
Active Time Zone
O
N at 08h00
OFF at 23h00
O
N at 04h00
OFF at 09h00
O
N at 04h00
OFF at 09h00
Follow the steps below to cancel the Timer Function (thus allowing the heat pump to
reheat the water as and when required during a 24 hour day):
1.
Press the
button.
2.
Press the
SET
button.
3.
Repeat steps 1 and 2 four times to cancel all 4 time settings (1 ON, 1 OFF, 2 ON
and 2 OFF.
NOTE:
•
It is possible to decrease your saving by setting your timers incorrectly (such as
letting the heat pump operatre during the coldest part of the day).
•
The heat pump will operate even without any timers being engaged.
•
For energy efficient timer settings please see Section 9: How to optimise energy savings.
The heat pump will therefore only run between 4 AM and 9 AM irrespective of the first
time Zone allowing it to run till 11 PM
NOTE:
Time zones in the
Timer Function are
NOT
allowed to overlap.
The table illustrates an
incorrect
timer setting where time zone 1 and time zone 2
overlaps with a resulting allowed operational time in column 3
3.
Press the
button to acknowledge the
Hour
setting and continue to the Minutes setting.
(The
Minutes
and the “
1 ON
” sign will flash.)
4.
Make use of the
buttons to set the
Minutes
parameter.
(Set to the first start-up Minutes)
5.
Press the
button to acknowledge the
Minutes
setting and continue to the “
1 OFF
”
Hour
setting.
(The
Hours
and the “
1 OFF
” sign will flash.)
6.
Make use of the
buttons to set the
Hour
.
(Set to the first shutdown
Hour
)
7.
Press the
button to acknowledge the
Hour
setting and continue to the
Minutes
setting.
(The
Minutes
and the “
1 OFF
” sign will flash.)
8.
Make use of the
buttons to set the
Minutes
.
(Set to the first shutdown
Minutes
)
9.
Press the
button to acknowledge the
Minutes
setting and continue to the
“
2 ON
”
Hour
setting.
(The
Hours
and the “
2 ON
” sign will flash.)
10. To set up the second time zone, repeat steps 2 to 7 above for “
2 ON
” and “
2 OFF
”.
Timer
Active
FOR INFORMATION ONLY
Configuration Management
M-Tech Industrial (Pty) Ltd