Endura 40100A04 Скачать руководство пользователя страница 8

- 8 -

4

"

the unit footprint

Co

n

c

rete

 Pad

 

must extend 

18" outside

 

45.00

°

2 1/2"

 Min.

18" outside the unit footprin

t

Co

n

c

re

te 

P

ad 

m

u

s

e

x

te

nd

 

8

"

4

"

Top View

R

eb

a

r

F

inished 

G

rad

e

R

e

b

a

r

C

O

NCRE

T

E

 S

L

AB

 DE

T

A

IL

 F

OR

 TRA

F

F

IC

 L

OAD

IN

G

(INTERIOR OR EXTERIOR)

Elevation View

(Co

n

n

ecti

n

g

 p

ip

e

 a

nd

 fi

tti

n

g

s

 b

othe

rs)

For

 un

it

 d

e

tails se

e

 s

p

eci

fica

ti

on

 s

he

e

for 

s

e

lec

te

d un

it

S

IDE

 V

IEW

 DE

T

A

IL

(INTERIOR OR EXTERIOR)

EXCAVATI

O

N

 AND

 

BACKFILL

 DETA

IL

DI

M

ENSI

O

N

S

72”

Ma

xi

mu

m

 

heigh

t

Native soil

Co

n

cr

e

te

 sla

b

C

ru

shed agg

regate

 

m

ateri

al appr

o

xima

tel

3/4" 

size 

roc

k, pea g

rave

o

r s

an

d

6

” M

in. ba

se cr

ushe

d

agg

regate mate

ri

al

app

ro

x. 3/4" s

ize 

ro

ck

,

pea g

rave

l o

sa

n

d

95 pr

o

ct

o

r.

unit (by others)

Clean 

ou

t to 

gr

a

d

e

Flow

on outlet pipe of each 

tee (414155BC)

2-Way cleanou

t

tee (414155BC)

2-Way cleanou

t

mechnical joint

 

c

oupling

 (b

y

 o

the

rs)

S

ta

nda

rd

 4”

mechnical joints

c

oupling 

(b

y

 ot

h

ers

)

S

ta

nda

rd 4”

o

n

 inle

t pip

e

 o

each

 

Cl

e

a

n ou

t to g

ra

d

e

u

n

it

 (

b

y

 ot

h

e

rs

)

Flow

72”

M

a

xim

u

m

 

hei

ght

50”

26”

22”

14

29”

79”

32”

39.5”

59”

43”

Ris

e

rs

 to

 g

rad

e

M

A

T

L

P

E

D

ESCRIP

TIO

N

 

D

W

G

 B

Y

L

.S

DWG

 NU

M

BER

: XL75BGT

4075A04

 

  4075A04

T

407

5

A04

M

 

 4075A04

M

T

En

d

u

ra X

L

 g

reas

e

 inte

rc

e

ptors

 a

re

 ra

te

d

 a

nd

 s

u

p

p

lie

d

 wi

th 

an

 in

terna

flow 

c

o

n

tr

ol 

sy

s

te

m

 alre

a

d

y

 i

pla

c

e

They do not require an external flow control system or air intake vent unless specified by local code requirements

 

o

being

 op

e

ra

te

d

 a

s

 a PDI 

G-101

 install

a

tion. 

Endur

a

 XL

 g

re

a

s

e

 in

te

rcep

to

rs 

ar

e

 only

 t

o

 be

 i

n

s

talled

 in

 t

he

 

manner and for the application shown.  Consult local codes for separate trapping requirements, cleanout locations

 

and additional installation instructions. Full instructional information supplied with every interceptor.    

 

NOTES

:

PROPR

IE

T

ARY

 AND

 CONFIDENTI

A

© 

Canplas

 2

0

1

7

C

a

npl

a

Indu

strie

Ltd

.

500 

V

e

te

ran

s D

ri

ve, Box 1800

Ba

rr

ie

, O

nt

ari

o

Canada L4M 4V3 

 

CAN: 1-800-461-1771   USA: 1-888-461-5307

D

ATE

: JAN 2020

R

E

V:

 1

.3

Endura brand produc

ts 

manufac

tu

red b

Can

p

las

 In

d

us

tr

ies

 Ltd

.

En

du

ra® X

L -

 E

XT

ERIOR

 BE

LOW GRADE INS

TAL

LA

TION IN

STRU

CTION

S

B

EL

OW

 GRA

DE

 IN

ST

AL

LA

TION INSTRU

CTION

S

1.

 

EX

CA

VA

TIO

N

1.

1.

W

idth

 and

 le

ngth

 o

f e

xc

ava

tion shall be minimum 12

” g

re

at

er th

an

 th

ta

nk di

m

en

sio

ns

 o

al

l side

s.

1.

Dept

of

 e

xc

av

ati

on

 sha

ll 

be 

at least 6

” deeper than tank bot

to

m

1.

IM

PO

RT

AN

T:

 Ma

ximu

burial depth 6

ft (72”) measu

red f

ro

m

 the 

air ba

la

nc

e ch

an

ne

l (

Endu

ra

XL

 Logo)

  

1.

Set

 the t

an

on

 w

ell

-p

ac

ked c

rushed agg

reg

at

m

at

erial 

app

ro

xi

m

at

el

y 3/4

” si

ze 

roc

k, pe

a g

ra

ve

l o

r  

 

sa

nd

. W

he

setting

 End

ur

 XL units

 th

ey

 m

ust

 be 

le

ve

l l

at

er

al

ly

 a

nd 

lo

ngit

udin

al

ly.

1.

an

cho

ring 

m

ay 

ho

w

ev

er

 be

 ne

cessa

ry as de

ter

m

in

ed 

by

 th

speci

fying engi

nee

r. T

ie

-d

ow

lo

ca

tio

ns 

ar

e

in

co

rpo

ra

ted

 to

 the

 tank

 and 

can be used in 

conjun

ction wit

co

at

ed

 stain

less

 st

ee

l c

ab

le

 a

nd

 a

n  

appli

cable 

anch

or

 met

hod based on s

ubsoi

l. S

pecific 

requi

re

m

en

ts

 to 

be

 de

ter

m

in

ed

 b

y speci

fy

in

en

gi

nee

r.

2.

 

B

AC

KFILLING

 & 

FINI

SH

ED

 C

ONCRETE S

LAB 

(TRA

FFIC

 L

OA

D

 R

ATE

D)

AA

SH

TO

 304 – 

H2

0 (1

6,

000l

bs)

 and 

app

ro

ved 

to C

SA

 B48

1.0 

Cla

ss

 ‘S

’ -20˚F

 to +100˚F

 (-29˚C 

to +38˚

C)

2.

Pr

ep

ar

ati

on 

of

 su

b g

ra

de per lo

cal j

urisdi

ctio

na

l r

ec

om

mend

atio

ns

.

2.

St

abi

liz

and 

co

m

pa

ct

 sub

 g

rade 

to 95% p

ro

ct

or per E

xc

av

ati

on

 in

form

ati

on

 ab

ov

e.

2.

.

2.

ade

 le

ve

l.

2.

2.

Pl

ac

minim

um 

6”

 agg

reg

at

e base bene

at

h po

ur

ed

 st

ru

ct

ur

al

 sl

ab

. A

gg

reg

at

e sh

ou

ld

 be 

3/

4”

 si

ze

 ro

ck 

or 

pea

 sh

ingl

e.

2.

re

fer 

to

 lo

ca

l speci

fy

ing

 engineer 

re

commend

ations and/

or

 lo

ca

l c

ode

 req

ui

re

m

en

ts

. N

ot

e:

 C

on

cr

et

e sl

ab 

 

dime

nsio

ns s

ho

wn

 a

re

 fo

r i

llust

ra

tion purposes onl

y.

2.

Co

nc

re

te 

to

 be

 28

 d

ay 

com

pr

essi

ve st

rengt

to 4000 PSI. 

Rein

fo

rc

em

en

t wit

No

.4

 rebar (1/2”)

 g

rade

 6

st

ee

l per

 A

ST

A6

15:

 con

ne

ct

ed with tie wi

re

. Rebar 

to

 be

 2½

” f

ro

m

 edge 

of

 co

nc

re

te

. Reb

ar

 spaci

ng 

12

” gri

d. 

4”

 spacing

 a

ro

un

acc

ess ope

ni

ng

s.

3.

 

PIPING 

CONN

EC

TION

S

3.

Al

l E

ndu

ra

® 

XL

 G

rease

 In

te

rc

ep

tors a

re

 ma

nu

fa

ct

ur

ed with

 no

 h

ub 

co

nne

ction

s. 

Th

readed

 con

ne

ctio

ns

 a

re

 

3.

Lo

call

y app

ro

ved

 mec

hani

cal joi

nt (MJ) 

couplings a

re used

 to

 co

nn

ec

t t

he

 in

let

 a

nd

 o

ut

let pipi

ng

 to

 th

3.

Ma

ke

 sys

tem

 pipi

ng 

con

ne

ctions usi

ng

 lo

cally app

ro

ved 

M

J c

ouplings

 in

sta

lling 

to

 m

an

uf

ac

tu

re

r’s 

 

bel

ow

 the

 wa

ter

 le

ve

l. 

DO N

OT

 PRE

SSURE

 TEST –

 R

isk of serious Inju

ry or De

ath

.

3.

DO

 N

OT

 dec

rease pipe diame

ter ac

ross the unit (i.

e. 4 inc

h in

le

t, 

in

ch

 o

utlet).

 If

 the pipi

ng

 sy

st

em 

in

st

all

ed in

 com

pli

an

ce

 w

ith

 lo

cal 

cod

e.

EX

TE

N

SION

 RI

SE

RS

 (O

ptional

)

4.

En

du

ra

® 

XL

 E

xt

ensi

on 

Risers p

ro

vide

 a

 m

axim

um

 o

f 3

5”

 e

xt

en

sio

n per rise

r. 

 B

ased 

on

 m

axim

um 

in

st

all

ati

on

 depth 

up 

to

 a

 m

aximum of 72

” depth of buri

al

 ca

ac

hie

ved

 (see 

1.

ab

ov

e), 

addi

ng 

Ex

te

nsio

Risers

 (or

 pa

rt

 the

reo

f) d

uring inst

al

la

tio

n.

 R

isers 

ar

cu

t t

lengt

on

 si

te

 to

 su

it inst

al

la

tio

n.

4.

4.

4.

m

ec

ha

nism.

 C

ut

 a

nd

 e

xt

en

d a length of 1½

” D

WV pipe per inst

ru

cti

ons supp

lie

d. 

4.

cle

anly

 b

y h

and or

 mec

hani

cal means using guide rings 

m

ol

ded

 in

to

 th

riser

 to

 gi

ve clea

n st

raig

ht

 cu

t. 

4.

Fit

 riser

 se

al

 p

ro

vided 

ov

er the 

cut edge

 o

f the riser 

and 

lo

ca

te 

fra

me (s

upplied)

 o

ver the se

al

 m

ak

in

 

su

re

 it is

 fu

lly se

at

ed

. S

ec

ur

w

ith lag sc

re

w

s p

ro

vided 

using the p

re

-dril

led 

lo

ca

tio

ns in

 fr

am

e. 

4.

Repe

at p

ro

cess 

fo

r additi

ona

l riser if/as 

requi

re

d. 

4.

DWV

 and

 se

cu

re t

he s

upp

or

t t

o the

 fr

am

wit

h the sc

re

w

 p

ro

vide

d. 

So

lv

en

t w

el

” v

en

t t

ee 

on

 to

of

 th

pipe 

to

 a

ct

 as

 a

 h

an

dl

e.

4.

Содержание 40100A04

Страница 1: ...appurtenance your Endura grease interceptor MUST be isolated from the drainage system in the event that nal drain testing or other system pressure testing is required DO NOT under any circumstances s...

Страница 2: ...latest addition to the proven line of Endura Grease Management products We have spent many thousands of hours in the development of Endura XL our aim being simple to produce the industry s best Hydrom...

Страница 3: ...heck review building plumbing pretreatment sewer and waste water Bottom line those who enforce the rules and regulations Cost Index A way of indicating the relative cost of different types of intercep...

Страница 4: ...mum safety factor of 2 shall be applied in calculation design Concrete Anchor Base if anchoring is required Min 6 Inle O t utlet Min 12 Min 12 Min 8 6 Minimum Base of Crushed aggregate material approx...

Страница 5: ...Extension Installation Guide 8 Finish to grade floor For in ground applications with vehicular traffic the upper 8 requires a reinforced concrete slab Refer to the Installation Specification section o...

Страница 6: ...150 gpm tank 4 Spigot connections with S Rated Lids 1 40150A04 Endura XL 150 gpm tank 4 Spigot connections with M Rated Lids 1 40150A04M Endura XL 150 gpm tank 4 Threaded connections with S Rated Lid...

Страница 7: ...hall additionally operate with an air balanced environment to equalize variation in internal pressures being controlled and maintained with an appropriately sized air balance means be supported by a L...

Страница 8: ...ongitudinally 1 6 anchoring may however be necessary as determined by the specifying engineer Tie down locations are incorporated to the tank and can be used in conjunction with coated stainless steel...

Страница 9: ...y specifying engineer 2 BACKFILLING FINISHED CONCRETE SLAB TRAFFIC LOAD RATED AASHTO 304 H20 16 000lbs and approved to CSA B481 0 Class S 20 F to 100 F 29 C to 38 C 2 1 Preparation of sub grade per lo...

Страница 10: ...ol If Required External Flow Control If Required GR N I E S A E R E T C P E T R O GR N I E S A E E T RC P E T R O GREA N I E S R E T C P E T R O GR N I E S A E R E T C P E T R O Endura XL grease inter...

Страница 11: ...criterial are met See Page 12 Trapping equivalent in compliance with applicable plumbing code requirements Venting The installation of the interceptor shall be vented downstream in accordance with lo...

Страница 12: ...main drain line connected to the interceptor The remain accessible for maintenance and The location of the cleanout should be recorded in you Installer Hand Over Check List See Page 14 is important th...

Страница 13: ...enetration tank seal Part 40100 TPS into the opening prepared and lubricate well using silicone pipe lubricant 6 As the orientation of the pipe when installed is important mark or identify on the top...

Страница 14: ..._______ Connections Cleanouts Mark where installed Extension Risers added Yes if Yes approx length of riser installed _________in m No Flow Control Handle Extended Yes No See Riser Extension Instructi...

Страница 15: ...place and well tightened MissingboltsMUSTbereportedtomanagementandreplacedimmediately Covers MUST meet the required load rating for the application see the Technical Information section Do NOT use alt...

Страница 16: ...ght sampling air balance cap must be raised also Air Balance Hole Maintenance IMPORTANT Regular Removal of Fat Oil and Grease Due to the capacity of your Endura XL Grease Interceptor it is necessary t...

Страница 17: ...of damage to the internal flow control where fitted by rooting or other equipment Access to the Outlet Well Although essentially a closed area the outlet system is able to be accessed by removal of th...

Страница 18: ...olume of Waste Removed _____________________ Gallons Liters Inlet Baffle Opened Inspected Yes No Flow Control Checked Cleaned Yes No Note The flow control device internal or external shall be inspecte...

Страница 19: ...equency I think I have missing parts Parts have been removed or lost during prior servicing Check exploded drawing in this manual to confirm the parts that are supposed to make up your interceptor mod...

Страница 20: ...Load Drainage Period 70 84 1 min 70 84 l p m 70 84 2 min 35 42 l p m 5 Select Interceptor falls between two sizes select the larger of the two interceptors For a one minute drainage period For a two m...

Страница 21: ...ivalent is not directly achievable by application of a standard formula As an experienced manufacturer in the Grease Management market we have been able to identify and validate a a manufacturers reco...

Страница 22: ...nce will be proportionally less too Rates will vary significantly by region and by contractor Always use a licensed or approved contractor to maintain your interceptor Do Endura XL tanks need to be di...

Страница 23: ...th the Products or on Manufacturer s website ii the Products have been installed and used in strict compliance with Manufacturer s written instructions as published and updated from time to time by Ma...

Страница 24: ...Email us feedback endurainterceptor com Limited LifetimeWarranty Registration Card Congratulations on your purchase of the Endura XL Grease Interceptor This product is supplied with a the manufacturer...

Отзывы: