30
Commissioning
7
Commissioning
The following chapter describes the basic procedure for first time or re-
peated putting into operation of the generator in "On-site operation" mode.
Perform the following described steps when you put your generator into
operation for the first time or put into operation again after transport.
NOTICE!
For start-up and operation of a generator on building and assembly sites,
Deutsche Gesetzliche Unfallversicherung (DGUV) in DGUV Information
203-032, the May 2016 edition, requires observance of special protective
measures and behaviour regulations.
Be sure to refer to the following section for a summary of this DGUV infor-
mation. It supplements the operating instructions for this special applica-
tion.
We also urgently advise observance of relevant DGUV information under
comparable operating conditions.
We recommend that you read DGUV Information 203-032 before starting the ini-
tial commissioning. In cases of doubt consult a qualified electrician.
Operation of the generator on construction and assembly locations ac-
cording to DGUV Information 203-032(BGI867).
According to the above information, your generators has been
classified as Ver-
sion A
and has the following markings:
CAUTION!
You must always abide by the steps required to protect people from dan-
gerous contact voltages when using your Version A generators as shown
in the 7.6 info-illustration!
•
A PRCD-S cannot be used here as a
residual current protection device
because it cannot be switched on.
Connection for
the protective
equipotential
bonding
Marking for de-
sign class A on
the device
Содержание ESE 1006 DHG-GT ES Duplex
Страница 65: ...65 Replacement parts NOTES...
Страница 67: ...67 Replacement parts W Warning notices 16 WEEE directive 58 Weight 62...