Commissioning
Proline t-mass 65 PROFIBUS DP/PA
48
Hauser
6
Commissioning
6.1
Function check
Make sure that all final checks have been completed before you start up your measuring point:
• Checklist for "Post-installation check"
• Checklist for "Post-connection check"
6.2
Switching on the measuring device
Once the post-connection checks have been successfully completed, it is time to switch on the
supply voltage. The device is now operational.
The measuring device performs a number of power on self-tests. As this procedure progresses the
following sequence of messages appears on the local display:
Normal measuring mode commences as soon as start-up completes.
Various measured values and/or status variables appear on the display (HOME position).
!
Note!
If start-up fails, an error message indicating the cause is displayed.
6.3
Quick Setup
All important device parameters for standard operation can be configured quickly and easily by
means of the Quick Setup menu, especially for devices that have been delivered with factory default
settings
!
Note!
If the measuring device has been ordered with customer-specific settings then the Quick Setup is
not necessary. Check that the parameterization protocol on the CD delivered with the device
matches your required data.
t-mass 65
START-UP
Start-up message
▼
DEVICE SOFTWARE
V XX.XX.XX
Current software version
▼
SYSTEM OK
OPERATION
Beginning of normal measuring mode
▼