Proline t-mass 65 PROFIBUS DP/PA
Installation
Hauser
27
4.4
Post-installation check
Perform the following checks after installing the measuring device in the pipe:
Measuring device condition and specifications
Notes
Is the measuring device undamaged (visual inspection)?
–
Does the device correspond to specifications at the measurement point, including
process temperature and pressure, ambient temperature, measuring range, etc.?
Check the name plate.
Installation
Notes
Correct alignment of pipe/gasket/flowmeter body?
Professional installation, e.g. correct pipe internal diameter, correctly sized gaskets?
Is the position chosen for the sensor correct, in other words suitable for sensor type,
fluid properties and fluid temperature?
Is there sufficient upstream and downstream pipe sensor?
Correct installation of flow conditioner (if fitted)?
Does the arrow on the sensor match the direction of flow through the pipe?
Correct sensor depth (insertion sensor only)?
Process environment/process conditions
Notes
Is the measuring device protected against moisture and direct sunlight?
–
Is the measuring device protected against overheating?
Is the measuring device protected against excessive vibration?
Check gas conditions (e. g. purity, dryness, cleanliness)
Select suitable orien-
tation
Содержание Proline t-mass 65 PROFIBUS DA
Страница 127: ...www addresses endress com ...