Brief operating instructions
Proline Prosonic Flow 91
2
Hauser
Brief operating instructions
The brief operating instructions are aimed at helping you commission your measuring device quickly
and easily:
Safety instructions
First familiarize yourself with the safety instructions to be able to carry out the following work steps quickly and easily.
Here, you can find information on:
• The designated use of the measuring device
• The operational safety
• The safety symbols and conventions used in the document
▼
Connecting the transmitter
Install the sensors using the transmitter software.
Therefore connect the transmitter first to the power supply.
▼
Display and operating elements
A brief overview of the different display and operating elements to allow you to start quickly.
▼
Installing the sensors
Installing the flowrate measuring sensors Prosonic Flow W (clamp-on)
▼
Sensor Setup
Measuring devices with a local display:
Use the "Sensor Setup" (
46) to determine the data required for sensor installation such as sensor distance, wire
length, pipe materials, sound velocity in liquids, etc.
• The system provides you with the sensor distance for the W "clamp-on" versions as distance data.
For the W sensors, you also receive the data in the form of a letter for sensor 1 and in the form of a number for
sensor 2. You can thus easily position the sensors with the aid of the mounting rail.
Measuring devices without a local display:
No Sensor Setup is available for devices without a local display.
The sensor installation procedure for such devices is explained on.
Connection of the sensor/transmitter connecting cable
▼
Customer-specific configuration
Complex measurement tasks require the configuration of additional functions which you can individually select, set and
adapt to your process conditions using the function matrix. There are two options:
• Setting parameters via the configuration program "FieldCare"
• Setting parameters via the local display (optional)
All functions are described in detail, as is the function matrix itself
!
Note!
Always start troubleshooting with the checklist on
55 if faults occur after commissioning or during operation. This
takes you directly (via various queries) to the cause of the problem and the appropriate remedial measures.