Commissioning
Proline Promass F 100 Modbus RS485
52
10
Commissioning
10.1 Function check
Before commissioning the measuring device:
‣
Make sure that the post-installation and post-connection checks have been performed.
• "Post-installation check" checklist→ 27
• "Post-connection check" checklist → 38
10.2 Connecting via FieldCare
• For FieldCare connection
• For connecting via FieldCare → 44
• For the FieldCare → 45 user interface
10.3 Setting the operating language
Factory setting: English or ordered local language
The operating language can be set in FieldCare or DeviceCare: Operation → Display
language
10.4 Configuring the measuring device
The
Setup
menu with its submenus contains all the parameters needed for standard
operation.
Setup
Device tag
‣
System units
‣
Medium selection
‣
Communication
‣
Low flow cut off
‣
Partially filled pipe detection
‣
Advanced setup