Proline 300 Modbus RS485
Commissioning
Hauser
31
8
Commissioning
8.1
Function check
Before commissioning the measuring device:
‣
Make sure that the post-installation and post-connection checks have been performed.
• "Post-installation check" checklist → 13
• "Post-connection check" checklist → 23
8.2
Setting the operating language
Factory setting: English or ordered local language
X X X X
X X X
X
X
20.50
Operation
Setup
Main menu
0104-1
Display language
English
Español
Français
Display language
English
Deutsch
Ã
0104-1
Ã
Español
Français
Display language
English
Deutsch
0104-1
Betrieb
Setup
Hauptmenü
Sprache
Deutsch
0104-1
XX
XX
1.
2.
3.
4.
A0029420
4
Taking the example of the local display
Содержание Proline 300
Страница 34: ......
Страница 35: ......
Страница 36: ...www addresses endress com 71528708 71528708 ...