Commissioning
EngyCal
®
RH33
36
Hauser
7
Commissioning
Make sure that all post-connection checks have been carried out before putting your device
into operation:
• See 'Post-installation check' section, (→ 20).
• Checklist, 'Post-connection check' section, (→ 31).
After the operating voltage is applied, the display and the green LED are illuminated. The
device is now ready to operate and can be configured via the keys or the "FieldCare" parameter
configuration software (→ 34).
Remove the protective film from the display as this would otherwise affect the
readability of the display.
7.1
Quick commissioning/make it run
For quick commissioning of the "standard" BTU meter application, you only have to enter 5
operating parameters in the
Setup
menu.
Prerequisites for quick commissioning:
• Flow transmitter with pulse output
• RTD temperature sensor, 4-wire direct connection
Menu/setup
•
Units
: Select unit type (SI/US)
•
Pulse value
: Select the unit of the pulse value of the flow transmitter
•
Value
: Enter the pulse value of the flow sensor
•
Mounting location
: Determine the mounting location of the flow transmitter
•
Date/time
: Set the date and time
The device is now operational and ready for measuring heat energy (cold energy).
You can configure device functions, such as data logging, tariff function, bus connection and
the scaling of current inputs for flow or temperature, in the
Advanced setup
menu or in the
Expert
menu. A description of these menus can be found in the Operating Instructions on the
CD-ROM provided.
• Inputs/flow:
Select the signal type and enter the start and end of the measuring range (for current
signal) or the pulse value of the flow transmitter.
• Inputs/temperature warm
• Inputs/temperature cold