Ensuring the degree of protection
Only the mechanical and electrical connections which are described in these instructions and
which are necessary for the required, designated use, may be carried out on the device
delivered.
‣
Exercise care when carrying out the work.
Otherwise, the individual types of protection (Ingress Protection (IP), electrical safety, EMC
interference immunity) agreed for this product can no longer be guaranteed due, for example,
to covers being left off or cable (ends) which are loose or insufficiently secured.
5.4
Post-connection check
Device condition and specifications
Notes
Are the outside of the sensor, assembly, cable undamaged?
Visual inspection
Electrical connection
Notes
Are the installed cables strain-relieved and not twisted?
Is a sufficient length of the cable cores stripped, and is it positioned
in the terminal correctly?
Check the fit (by pulling gently)
Are all the screws terminals properly tightened?
Tighten
Are all cable entries mounted, tightened and leak-tight?
For lateral cable entries, make sure the cables
loop downwards to allow water to drip off
Are all cable entries installed downwards or mounted laterally?
6
Commissioning
Before first commissioning, check if:
• the sensor is correctly installed
• the electrical connection is correct.
If using an assembly with automatic cleaning, check that the cleaning medium (e.g. water or
air) is connected correctly.
L
WARNING
Escaping process medium
Risk of injury from high pressure, high temperatures or chemical hazards
‣
Before applying compressed air to an assembly with cleaning facility, make sure the
connections are correctly fitted.
‣
Do not install the assembly in the process if you cannot make the correct connection
reliably.