background image

P5/8/08

                        Page 7 of 26

FASTLANE SWIM UNIT ASSEMBLY

1.

 

Verify that all items have arrived.  

NOTE: If using a power drill, do NOT over

tighten the screws, as this will strip the thread in the PVC of the Fastlane
Swim Unit.

2.

 

Carefully unpack the Swim Unit Housing, Swim Unit Base and its components from
boxes 11, 12 and 14 as noted above.  Remove and verify all hardware kits from
inside.  Close the boxes and flip them upside down on the ground to use as a
workbench or collapse the boxes and use as a smooth surface to protect the
components from scratching.

3.

 

Turn the Swim Unit Housing upside down on the box or another smooth surface.
Remove the block of wood by removing the screws that attach the wood to the Swim
Unit Housing.  The wood is for packaging purposes only and may be discarded.

4.

 

Remove the screws on the two sides and the front of the Swim Unit Housing that
secure the throat.  Set the throat and the screws aside to be used in Step 13.

5.

 

Set the Swim Unit Base on the cardboard box with the cylinder facing up.  Lay the
hydraulic hoses that come pre-attached to the Swim Unit Base to each side so that
they are out of the way.  Flip the Swim Unit Housing over and set on top of the Swim
Unit Base.  Secure the Swim Unit Base to the Swim Unit Housing by using six (6) of
the 3/4” stainless steel screws provided (three screws on each side.  

NOTE: Do not

over-tighten.

6.

 

Carefully feed the bond wire that is attached to the Swim Unit Base up through the
horizontal honeycomb grill located in the bottom of the Swim Unit Housing and up
through the turning vanes.  Install the grab rail using six (6) 3/4” stainless steel
screws and the six (6) 10-32 stainless steel lock nuts provided.  Secure the bond
wire that has been fed up through the turning vanes under one of the six screws.
Secure the other bond wire that has been pre-installed in the Swim Unit Housing
under a 2

nd

 screw in the grab rail.  

NOTE: Do not over-tighten.

Содержание FASTLANE POOL

Страница 1: ...P5 8 08 Page 1 of 26 FASTLANE POOLTM OWNER S MANUAL...

Страница 2: ...luid 11 1 Fastlane Swim Unit Housing 12 1 Fastlane Swim Unit Base with attached 25 of Hydraulic Hoses 13 1 Fastlane Hydraulic Power Unit 5 hp standard 6 hp optional 14 1 Accessory Kit which includes a...

Страница 3: ...ons or in areas that may experience excess ground water A 2 x 8 x 22 piece of lumber installed under each support leg and leveled with the ground is very effective Make sure the entire base of each le...

Страница 4: ...ane Pool is fully assembled you will be swimming towards the skimmer so plan accordingly 2 Align the struts G with the prepared cut outs at top of liner 3 Connect bottom tubes F to struts G one at a t...

Страница 5: ...ht when facing the pool wall Refer to Diagram 2 Wider Straight Tube Layout DIAGRAM 2 WIDER STRAIGHT TUBE LAYOUT 5 Feed the connected tubes into the corresponding sleeves of the liner Remember to align...

Страница 6: ...Slowly begin to fill the pool with water until the bottom of the liner is taught Remove any wrinkles in the pool liner as this time as it will be difficult to do once the pool is full 9 To prevent lea...

Страница 7: ...using that secure the throat Set the throat and the screws aside to be used in Step 13 5 Set the Swim Unit Base on the cardboard box with the cylinder facing up Lay the hydraulic hoses that come pre a...

Страница 8: ...ight and secure them to the top of the Swim Unit Housing using the green hose clamps provided To accomplish this unscrew the green hose clamps insert the hoses and re screw snugly into the top of the...

Страница 9: ...s a total of four 4 large and two 2 small washers used in the wheel assembly Be sure that two large washers are located between each wheel and the intake grill on the back bottom of the Swim Unit base...

Страница 10: ...he mark so that the mark is in the center of the grommet Trace the INSIDE of the grommet onto the liner Using a sharp blade utility knife slowly and carefully cut out the traced circle NOTE Cutting a...

Страница 11: ...is to be hard wired into the 5 5 kW Electric Heater by the electrician Separately a 110 volt two speed pump with the switch on the rear of the pump and power cord with plug already wired into it done...

Страница 12: ...emale slip x female slip 2 Adapter male thread x male slip 13 Nipple 1 Eyeball fitting male thread 2 Plug threaded C Additional Tools Required Tape measure Hack saw Fittings and Piping Endless Pools I...

Страница 13: ...13 of 26 NOTE Pictures are not drawn to scale Parts can be ordered from Endless Pools Inc a local hardware store or a plumbing supply store QTY 1 QTY 1 QTY 9 QTY 2 QTY 2 QTY 4 QTY 2 QTY 13 QTY 3 QTY 2...

Страница 14: ...icking out of the wall of the Fastlane Pool Tighten with a large pair of channel locks Make sure the nut is very snug but do not over tighten as this may crack your fitting Thread the male portion on...

Страница 15: ...n in the Fastlane Pool The provided plugs can also be threaded into the threaded end of the thru wall fitting to prevent the pool from draining when the water quality system equipment needs maintenanc...

Страница 16: ...nal if you need guidance on equipment location Be sure to install the ball valves hose bibb and unions in the order we have shown Their location is important for the maintenance requirements of the sy...

Страница 17: ...e supplied with the circulating pump The two 2 3 8 bolts are used to fasten the circulating pump using the threaded inserts already located in the base Use the self drilling fasteners to mount the fil...

Страница 18: ...ally or vertically to fit specific spaces 36 minimum vertical clearance is required to remove the filter cartridge As mentioned previously suitable drainage must be provided at both the Fastlane Pool...

Страница 19: ...dition the Power Unit needs to be checked periodically for maintenance and should be easily accessible 1 Carefully remove the Power Unit from the packaging NOTE The Power Unit is heavy 2 Place the Pow...

Страница 20: ...ydraulic run hose In this case fill with the full five gallons first and run the Power Unit for one minute to fill the hydraulic run hoses Turn Power Unit off and add the additional oil NOTE Do not ru...

Страница 21: ...quipped with an automatic timer shutting off the system thirty 30 minutes after receiving its last command INSTALLING AN ANTENNA EXTENSION Your Fastlane remote control operates by radio waves Should t...

Страница 22: ...intaining your pool water is essential to the life and health of your equipment Maintain a minimal level of 0 5 ppm free chlorine in your pool at all times as necessary Adding 1 2 cup of Clorox a day...

Страница 23: ...view ports When storing your pool thoroughly clean and dry the liner and carefully roll it up Store your pool and Fastlane Swim Unit in a dry safe place Always store the hard parts and the liner in se...

Страница 24: ...d be checked every two weeks Heater Optional It is very important that you read the heater literature before operating the heater During the initial 24 hour start up period you may turn on your heater...

Страница 25: ...P5 8 08 Page 25 of 26 FASTLANE POOL START UP KIT Additional water quality and swimming products are always available at www myendlesspools com...

Страница 26: ...ERLY BONDING OR MAINTAINING PROPER WATER CHEMISTRY pH level must be maintained between 7 4 and 7 8 and total alkalinity between 80 and 120 ppm The total dissolved solids TDS must be no greater than 3...

Отзывы: