– Page 12 –
4
Start up
Start-up Procedure
Conduct a final visual check to ensure that it is safe to start commissioning the iSaver (all connections secured, tools
removed, safety checks completed)
Turn on all breakers within the iSaver unit.
Close the iSaver main access panel door and secure the panel locks.
Turn ON the main incomer MCCB to the iSaver. It is recommended that during this start up phase, some plant
equipment is turned on to create some electrical load. It is mandatory to have a minimum of 15% KVAR load (based
on the size of equipment used) to have accurate startup results.
The iSaver controller will turn ON indicating Mains parameters.
iSaver Dynamic Controller
Setting the controller
By pressing
and
keys simultaneously for a few seconds, the program mode is selected. The display
shows the following screen;
EDC 814
iSaver Dynamic Controller
MODE
MORE
AUTO
MAN
AL.ACK
A/M C1 C2 C3 C4 C5 C6 C7 C8 ALR
RXD
TXD
ENERGY TECHNOLOGIES
ncorp
C