Doc. No: 01999929
Revision: C
9 of 10
Issue Date: 08/15/21
PART VI
SECURING ASSEMBLY TO FOUNDATION
1. Tighten (4) ITEM 4 aligning bolt holes such that sufficient room for bolt placement is available.
2. Mark bolt holes on pad and install anchor bolts (supplied by others), washer and lock nuts after placing structure
over foundation.
SEE FIGURE 15.
3. Inspect finished product for tight clamps, joints and panels.
SEE FIGURE 16.
FIGURE 15
FIGURE 16
Finished Shower Shelter™
Assembly