background image

www.

en

c

loscreens

.com

7

ASSEMBLY

 INSTRUCTIONS

ZP19047

 Ensuring the routed 

holes are facing 

down, slide the other 

horizontal rail over 

the top of the posts. 

Continue sliding the rail 

down, inserting each 

vertical picket into the 

routed holes in the top 

rail, until the pre-drilled 

holes in the top rail and 

posts align. Drive (4) 

¾” self-drilling stainless 

steel screws into the 

pre-drilled holes.

 Ensuring the routed holes are 

facing up, slide one rail over the 

bottom of the posts. Slide the rail up 

and guide the vertical pickets into 

the routed holes. Continue sliding 

the rail up until the pre-drilled holes 

in the rail and posts align.

Note:  

align holes.

B

H

1. 

Slide the Post Anchors 

(B)

 into the bottom of the 

post. 16" of post anchor should be visible.

2. 

Use the 1/8" Drill Bit 

(K)

 to drill (4) total holes in 

the post anchor through the pre-drilled holes in the 

bottom rail.

3. 

Drive (4) 3/4" Self-Drilling Stainless Steel Screws 

(H)

 

into the pre-drilled holes in the horizontal rail.

K

STEP 4.2

STEP 4.3

STEP 4.4

Содержание Highland ZP19047

Страница 1: ...www encloscreens com Highland 45 min Approximate assembly time Scan the QR code for an assembly video ASSEMBLY INSTRUCTIONS ZP19047 VER 082021 Vinyl Privacy Lattice Screen 2 Pack 36 W x 57 H ...

Страница 2: ...rvice department parts nychbrands com support encloscreens com 704 892 5222 877 234 6196 Customer service agents are available to take calls weekdays from 8am 5pm EST If you call outside of business hours please leave a voicemail To help you quickly and accurately please have reference item number ZP19047 and the specific part name which can be found on page 4 It is helpful if you can provide the ...

Страница 3: ...www encloscreens com 3 ASSEMBLY INSTRUCTIONS ZP19047 Detailed Product Dimensions Specifications 1 1 2 in 54 1 2 in 16 in 36 in 2 1 4 in 2 1 4 in 57 in ...

Страница 4: ...B Self Tapping Stainless Steel Screw 16 Bag A Joiner Clip 2 Rail End Cap 8 4 loose 4 installed Horizontal Picket 28 x 1 x 32 Vertical Picket 20 x x 52 Horizontal Rail 4 1 x 1 x 36 Post Cap 4 Post 4 x 1 x 56 STEP 1 LAY OUT MATERIALS J K I H A C E F B D Post Anchor 4 x 1 x 20 1 8 Steel Drill Bit 1 G ...

Страница 5: ...rtical Pickets C and arrange them as shown Note It may take some light force to insert horizontal pickets through the routed holes Note Make sure the routed holes for each vertical picket line up Insert 14 Horizontal Pickets E through the routed holes in the vertical pickets C E STEP 2 1 STEP 2 2 ...

Страница 6: ...CH THE RAILS Take 2 loose Rail End Caps G and pressure fit one rail end cap to the end of each of the two Horizontal Rails F Starting with one Post D slowly slide the horizontal pickets one by one into the routed holes in the post Do the same for the second post ensuring that the tabs of the posts are at the same end of the screen as shown D G F STEP 3 1 STEP 4 1 ...

Страница 7: ...g the routed holes are facing up slide one rail over the bottom of the posts Slide the rail up and guide the vertical pickets into the routed holes Continue sliding the rail up until the pre drilled holes in the rail and posts align Note align holes B H 1 Slide the Post Anchors B into the bottom of the post 16 of post anchor should be visible 2 Use the 1 8 Drill Bit K to drill 4 total holes in the...

Страница 8: ...ated All 16 of the post anchors should be inserted into the ground so they are no longer visible Push down on the top of the posts with both hands 3 STEP 5 INSTALL THE SCREENS 1 If your ground is too hard loosen the top 6 or 7 of the ground with a claw hammer as illustrated 2 Add water to the loosened soil 3 Use a block of wood to protect the top of post and gently hammer the post into the ground ...

Страница 9: ...rd or you have more than 3 or 4 panels to install please consider these options 1 Use a 1 diameter auger bit commonly used for planting tulips as illustrated 15 20 on Amazon com 2 Drill a hole about 12 to 16 deep at the desired location and fill the holes with water as illustrated 3 Push the panel posts into the holes ...

Страница 10: ...fill excavated dirt and tamp down Optional If your ground is very hard you may need to dig a single hole large enough to accommodate one post from each panel This hole should be approximately 8 in diameter and 16 deep Backfill and tamp the dirt 8 diameter x 16 deep Level STEP 5 4 STEP 5 5 ...

Страница 11: ...11 ASSEMBLY INSTRUCTIONS ZP19047 Fasten the screens together with 2 Joiner Clips J using 4 1 Self Drilling Stainless Steel Screws I STEP 6 FASTEN JOINER CLIPS Bottom Rail J I Top Rail 90 application 45 application STEP 6 1 ...

Страница 12: ...www encloscreens com 12 ASSEMBLY INSTRUCTIONS ZP19047 Push the Post Caps A down over the posts to lock into place STEP 7 INSTALL POST CAPS A STEP 7 1 ...

Страница 13: ...www encloscreens com support encloscreens com 704 892 5222 877 234 6196 6935 Reames Rd Ste K Charlotte NC 28216 ASSEMBLY INSTRUCTIONS ZP19047 VER 082021 ...

Отзывы: