www.
en
c
loscreens
.com
10
ASSEMBLY
INSTRUCTIONS
ZP19047
Level the screen as
necessary, backfill
excavated dirt, and
tamp down.
Optional:
If your ground is very hard, you
may need to dig a single hole large
enough to accommodate one post
from each panel. This hole should be
approximately 8” in diameter and 16”
deep. Backfill and tamp the dirt.
8” diameter
x
16” deep.
Level
STEP 5.4
STEP 5.5