www.
en
c
loscreens
.com
ASSEMBLY
INSTRUCTIONS
EC18003
/
EC18004
9
1.
Loosen the top 6" of the ground with a claw
hammer.
2.
Add water to loosened soil.
3.
Use a block of wood to protect the post and
gently hammer each post into the ground.
1.
If your ground is very hard, dig a hole 8" in diameter and 10" deep, large
enough to accommodate one post from each panel.
2.
Level the screen, backfill excavated dirt, and tamp as needed.
STEP 5.2
STEP 5.3
2
1
3
1
2