WIND TECHNOLOGY
+34 96 556 00 18 [email protected]
Avenida de Ibi 44
–
P.O. 182-03420 | Castalla (Alicante), España
www.enair.es
P a g e
|
19
Step 3: Shovels
To ensure proper assembly of the blades, there is a protrusion on t he blade that
should fit w ith t he corresponding hole in the conical scoop.
Screws:
Allen screw scoop-holder: DIN 912 A2 M10x80 INOX 12
Allen screw scoop-holder: DIN 912 A2 M10x80 INOX 3
Pressure Washers screw union: DIN 127 M-10 zinc plat ed 15
Tools:
17 spanner, hexagonal of 17 and torque wrench
Tightening torque :
46 Nm oder 34 Lbf .ft
ATTENTION: By tightening, there must remain a small clearance between the
bucket and the counterweight
ATTENTION: When the tightening is done some crunches could be heard. This
is absolutely normal and needed this guarantees the optimal fixing of the blade
Содержание E30 PRO
Страница 41: ......