13 / 16

6.

Maintenance

6.1.

General 

The internal switch is absolutely maintenance-free by using a solid state semiconductor .

6.2.

Function check

Similar to all measuring and test instruments the correct function of the battery supply switch should be checked from
time to time. The check is best carried out according to the following procedure:

-

Switch on the power mains supply and connect the DUT battery supply.

-

Select 

NORMAL

 operation;

-

Select the 

Off time

 to 200ms;

-

Select the shunt resistor to 10

;

-

Select the 

AUTO

 trigger mode.

After pushing the 

TEST ON

 button the LED should now blink at a frequency of 1Hz and the EUT supply is switched

off for 200ms each time. This can be checked at the 

Monitor

 

CRO

  output. For this purpose a storage oscilloscope of

at least 20MHz bandwidth is needed.

6.3.

Test setup

The test offered by the AN 200 generator is a immunity test on electronic equipments or devices. Therefore it is
the responsibility of the user to avoid critical failures and risks to the environment and operator. 

Please refer to the safety manual before starting to work with the AN 200

Figure 15 : Setup for pulses in the  ms range

Figure 16 : Setup for pulses in the 

µ

s / ns range

Important

- The artificial network AN shall be connected directly to the ground
  reference plane. 
- All wires between AN and the DUT shall be isolated from the
  ground plane by 50mm.
- The DUT will be placed on the ground plane as in real installation.

- directly grounded to the ground plane  or
- 50mm isolated from the ground plane

- The position of the instruments shall be as specified in the standard.

6.4.

Safety aspects

National and international recommendations regarding human safety must be followed. When setting up the test
national and international regulations regarding human safety have to be guaranteed. 

The test offered by the AN 200 generator is a immunity test on electronic equipments or devices. Therefore it is
the responsibility of the user to avoid critical failures and risks to the environment and operator. 

Long and distributed lines of the EUT are able to radiate a certain energy to their vicinity. Therefore it is also the
responsibility of the user to decide whether it is allowed to conduct immunity tests in a given installation. 

Содержание AN 200

Страница 1: ...y lines of a Device Under Test DUT A device under test which is considered a potential source of conducted disturbances should be tested according to ISO 7637 part 2 The AN 200 includes an electronic...

Страница 2: ...rk 9 4 Technical Data 10 5 Calibration Measuring procedure 11 5 1 Test load 11 5 2 Test voltage 11 5 3 Switch off times 11 5 4 Blockdiagram 11 5 5 Measuring results 12 5 5 1 Voltage drop in dependence...

Страница 3: ...r conducted emission transients ISO 7637 Teil 2 Road vehicles Electrical disturbances by conduction and cpouling Part 2 Electrical transients conduction along supply lines only several standards In ac...

Страница 4: ...g the ARTIFICIAL NETWORK button the artificial network is put into operation The electronic battery supply switch is short circuited The AN 200 can be used as an artificial network only 4 TEST ON By p...

Страница 5: ...stor value of 2 The 2 value is required when measuring transient emissions as per ISO DIN 7637 standard 10 Selection of the shunt resistor With this knob the shunt resistor can be switched to 40 10 or...

Страница 6: ...for the DUT is connected to this input The nominal dc supply parameters allowed are 30V 25A 4 Measuring output with 50 coaxial resistor For measuring conducted emission spectrum on battery supply lin...

Страница 7: ...r are in the circuit For remove the RC network you must disconnect the 50 Resistor Rz at the rear side of the AN 200 Figure 4 Switch The switch inside the AN 200 is active and the inductance is bypass...

Страница 8: ...1000V The electronic switch are electronically protected against overload and can withstand short circuit conditions Specific protection requirements of the EUT must be separately assured by the user...

Страница 9: ...cal network Inductance L 5 H Rl 5m RC Network Cz 0 1 F 250V ac Rz 50 Source input Connectors A B Output DUT Connectors P B Figure 8 The parallel resistor Rz 50 is built as a coaxial resistor and is pl...

Страница 10: ...ding ISO DIN 7637 5 H 50 Inductance 5 H 5 m Shunt resistor Rs Internal selectable 40 10 Option External shunt resistor Rs 2 2 Trigger MANUAL Manual trigger of a single event AUTO Automatic trigger wit...

Страница 11: ...off times should be determined under varying test voltages Proposals for Va U1 13 5V and U2 27V Consequently constant currents of 22 5A or 45A must be considered Due to the fact that the AN 200 is onl...

Страница 12: ...to standards All measuring values indicated as well as the curve illustrated have been recorded with a serial model Reference values measured with AN 200 Input Voltage 17 75 V Output Voltage 13 50 V U...

Страница 13: ...nvironment and operator Please refer to the safety manual before starting to work with the AN 200 Figure 15 Setup for pulses in the ms range Figure 16 Setup for pulses in the s ns range Important The...

Страница 14: ...ery Groups 7 1 Basic equipment Artifical network AN 200 AN 200B Mains cable 1 set safety labor cables red black Manual on CD Calibration certificate 7 2 Options AN 200B Artifical network for 60V 50A F...

Страница 15: ...s to which conformity is declared Emissions EN 61000 6 4 2001 EN 55022 1998 A1 2000 Class A EN 61000 3 2 A14 2000 Conducted and radiated Harmonics Immunity EN 61000 6 2 2001 EN 61000 4 2 1995 A1 1998...

Страница 16: ...EM TEST AN 200 Bedienungsanleitung V 2 00 16 16 8 2 AN 200 Overview Figure 19 Overview AN 200 AN 200B...

Отзывы: