The gas line can be routed either through the floor or wall. The gas
line opening should be made at this time. Location of the opening
will be determined by the position of floor joists and the valve and
union used for servicing.

Check all local codes for requirements, especially for the size and
type of gas supply line required.

Recommended Gas Pipe Diameter

Pipe Length

Schedule 40 Pipe

Tubing, Type L

(Feet)

Inside Diameter

Outside Diameter

Nat.

L.P.

Nat.

L.P.

0-10

1/2"

3/8"

1/2"

3/8"

1.3 cm

1.0 cm

1.3 cm

1.0 cm

10-40

1/2"

1/2"

5/8"

1/2"

1.3 cm

1.3 cm

1.6 cm

1.3 cm

40-100

1/2"

1/2"

3/4"

1/2"

1.3 cm

1.3 cm

1.9 cm

1.3 cm

100-150

3/4"

1/2"

7/8"

3/4"

1.9 cm

1.3 cm

2.2 cm

1.9 cm

Note: Never use plastic pipe. Check to confirm whether your local
codes allow copper tubing or galvanized.

Note: Since some municipalities have additional local codes, it is
always best to consult your local authority and installation code.

Figure 1

Installing a New Main Gas Cock
Each appliance should have its own manual gas cock.
A manual main gas cock should be located in the vicinity of the
unit. Where none exists, or where its size or location is not
adequate, contact your local authorized installer for installation
or relocation.

Compounds used on threaded joints of gas piping shall be
resistant to the action of liquefied petroleum gases. The gas lines
must be checked for leaks by the installer. This should be done
with a soap solution watching for bubbles on all exposed connec-
tions, and if unexposed, a pressure test should be made.

Never use an exposed flame to check for leaks. Appliance
must be disconnected from piping at inlet of control valve and
pipe capped or plugged for pressure test. Never pressure test
with appliance connected; control valve will sustain damage!

A gas valve and ground joint union should be installed in the gas
line upstream of the gas control to aid in servicing. It is required
by the National Fuel Gas Code that a drip line be installed near the

gas inlet. This should consist of a vertical length of pipe tee
connected into the gas line that is capped on the bottom in which
condensation and foreign particles may collect.

Figure 2

Method of Installing a Tee Fitting Sediment Trap (Figure 2)
The use of the following gas connectors is recommended:
— ANS Z21.24 Appliance Connectors of Corrugated Metal

Tubing and Fittings

— ANS Z21.45 Assembled Flexible Appliance Connectors of

Other Than All-Metal Construction

The above connectors may be used if acceptable by the authority
having jurisdiction.

Pressure Testing of the Gas Supply System
1.

To check the inlet pressure to the gas valve, a 1/8" (3mm)
N.P.T. plugged tapping, accessible for test gauge connec-
tion, must be placed immediately upstream of the gas supply
connection to the appliance.

2.

The appliance and its individual shutoff valve must be
disconnected from the gas supply piping system during any
pressure testing of that system at test pressures in excess of
1/2 psig (3.5 kPa).

3.

The appliance must be isolated from the gas supply piping
system by closing its individual manual shutoff valve during
any pressure testing of the gas supply piping system at test
pressures equal to or less than 1/2 psig (3.5 kPa).

Attention! If one of the above procedures results in pressures in
excess of 1/2 psig (14" w.c.) (3.5 kPa) on the appliance gas valve,
it will result in a hazardous condition.

Checking Manifold Pressure
Natural gas will have a manifold pressure of approximately 3.5"
(.871kPa) w.c. at the pressure regulator outlet with the inlet
pressure to the pressure regulator from a minimum of 4.5" w.c.
(1.120kPa) for the purpose of input adjustment to a maximum of
10.5" w.c. (2.614kPa).  Propane gas will have a manifold pressure
approximately 10.0"w.c. (2.49kPa) at the pressure regulator
outlet with the inlet pressure to the pressure regulator from a
minimum of 11.0"w.c. (2.739kPa) for the purpose of input
adjustment to a maximum of 13.0"w.c. (3.237kPa).

A test gage connection is located downstream of the gas appliance
pressure regulator for measuring gas pressure. The connection is
a 1/8 inch 3mm) N.P.T. plugged tapping.

Содержание EE-25-2

Страница 1: ...edbyaqualifiedinstaller service agency or the gas supplier INSTALLATION INSTRUCTIONS AND OWNER S MANUAL UNVENTED ROOM HEATER MODEL EE 25 2 EFFECTIVE DATE APRIL 2001 This is an unvented gas fired heate...

Страница 2: ...and Ventilation Air 6 Gas Supply 7 Clearances 8 Combustible Material 8 Wall Mount Installation 9 Optional Floor Stand Installation 9 Lighting Instructions 10 Main Burner Flame Characteristics 11 Pilo...

Страница 3: ...THOUT FRONT PANEL INSTALLED IMPORTANT SAFETY INFORMATION WARNING When used without adequate combustion and ventilation air heater may give off CARBON MONOXIDE an odor less poisonous gas Do not install...

Страница 4: ...rvice or make adjustments in an area where the conditions are such that you may not detect the odor if there has been a leak of LP Gas Odor fade due to oxidation by rust or adsorption on walls of new...

Страница 5: ...eout and smokewilloccur Topreventtriggeringofsmokealarms ventilate the room in which the unit is installed Qualified Installing Agency Installation and replacement of gas piping gas utilization equip...

Страница 6: ...may be located and for determining if this area fits the definition of an unconfined space The maximum input of the EE 25 2 is 25 000 Btu per hour Based on the 50 cubic feet per 1 000 Btu per hour for...

Страница 7: ...rip line be installed near the gas inlet This should consist of a vertical length of pipe tee connected into the gas line that is capped on the bottom in which condensation and foreign particles may c...

Страница 8: ...ing tile etc 2 inches 51mm Provide adequate clearances around air openings Adequate accessibility clearances for purposes of servicing and proper operation must be provided Figure 3 Figure 4 COMBUSTIB...

Страница 9: ...rs Refer to Figure 8 4 Mount heater onto the 3 screwheads and complete tighteningthescrewheadstotheplasticexpansionanchors 5 Connect the gas line Figure 8 OPTIONAL FLOOR STAND INSTALLATION Figure 7 Op...

Страница 10: ...click when the safety magnet in the gas control is de energized Pilot can now be relighted Repeat steps 5 through 9 11 Turn gas control knob counterclockwise to HI 12 Replace front panel 13 Turn on a...

Страница 11: ...roper flame The main burner may be cleaned by forcing water into the ports and the throat of the burner The burner should be blown dry or heated to remove all water before replacing To remove main bur...

Страница 12: ...Check for gas leaks To Remove Main Burner Orifice 1 Grasp the orifice fitting with a 5 8 16mm open end wrench 2 Use 3 8 10mm open end wrench to remove main burner orifice from orifice fitting turn cou...

Страница 13: ...VF 140 Top Shield 10 VF 131 Chamber Back 11 P 213 Orifice NAT Gas 11 P 204 Orifice LP Gas 12 P 212 Orifice Fitting 13 VF 138 Front Shield Assembly 14 SR 209 Regulator Bracket 15 R 2784 Inlet Regulato...

Страница 14: ...Page 14 R 2688 PARTS VIEW...

Страница 15: ...de of front shield assembly by measuring down 9 229mm from the upper right corner of the shield assembly See Figure 1 Align 3 16 5mm spacer and oblong clearance hole on switch box with 1 8 3mm screw h...

Страница 16: ...to the adapter and be electrically grounded CAUTION Label all wires prior to disconnection when servicing controls Wiring errors can cause improper and dangerous operation Verify proper operation afte...

Отзывы: