Empire Comfort Systems EE-25-2 Скачать руководство пользователя страница 16

Page 16

R-2688

. ...

.

Wiring
The appliance, when installed, must be electrically grounded in
accordance with local codes or, in the absence of local codes, with
the National Electrical Code ANSI/NFPA No. 70, if an external
electrical source is utilized. This appliance is equipped with a
three-prong [grounding] plug for your protection against
shock hazard and should be plugged directly into a properly
grounded three-prong receptacle. Do not cut or remove the
grounding prong from this plug. 
For an ungrounded receptacle,
an adapter, which has two prongs and a wire for grounding, can be
purchased, plugged into the ungrounded receptacle and its wire
connected to the receptacle mounting screw. With this wire
completing the ground, the appliance cord plug can be plugged
into the adapter and be electrically grounded.

CAUTION: Label all wires prior to disconnection when
servicing controls. Wiring errors can cause improper and
dangerous operation. Verify proper operation after servicing.

Oiling Blower Motor
The blower motor does not have oiling holes. Do not attempt to oil
the blower motor.

WARNING:
Unplugging of blower accessory will not stop the heater
from cycling. To turn off gas to the unvented heater: Push
in gas control knob slightly and turn clockwise to "OFF."
Do not force.

Index

  Part

 No.

Number

Description

1

R-1468

Bushing

2

VF-153

Mounting Bracket

3

R-2695

Motor

4

R-2696

Fan Blade

5

R-2104

Fan Control

6

DV-806

Switch Box

7

DV-807

Switch Box Cover

8

R-2113

Spacer

9

R-896

Bushing

10

R-2091

Wire Assembly

11

VF-068

Cord Set

PARTS LIST

If any of the original wire as supplied with the appliance must be replaced,
it must be replaced with type 125

°

C wire or its equivalent.

OPTIONAL BLOWER INSTALLATION INSTRUCTIONS (continued)

Содержание EE-25-2

Страница 1: ...edbyaqualifiedinstaller service agency or the gas supplier INSTALLATION INSTRUCTIONS AND OWNER S MANUAL UNVENTED ROOM HEATER MODEL EE 25 2 EFFECTIVE DATE APRIL 2001 This is an unvented gas fired heate...

Страница 2: ...and Ventilation Air 6 Gas Supply 7 Clearances 8 Combustible Material 8 Wall Mount Installation 9 Optional Floor Stand Installation 9 Lighting Instructions 10 Main Burner Flame Characteristics 11 Pilo...

Страница 3: ...THOUT FRONT PANEL INSTALLED IMPORTANT SAFETY INFORMATION WARNING When used without adequate combustion and ventilation air heater may give off CARBON MONOXIDE an odor less poisonous gas Do not install...

Страница 4: ...rvice or make adjustments in an area where the conditions are such that you may not detect the odor if there has been a leak of LP Gas Odor fade due to oxidation by rust or adsorption on walls of new...

Страница 5: ...eout and smokewilloccur Topreventtriggeringofsmokealarms ventilate the room in which the unit is installed Qualified Installing Agency Installation and replacement of gas piping gas utilization equip...

Страница 6: ...may be located and for determining if this area fits the definition of an unconfined space The maximum input of the EE 25 2 is 25 000 Btu per hour Based on the 50 cubic feet per 1 000 Btu per hour for...

Страница 7: ...rip line be installed near the gas inlet This should consist of a vertical length of pipe tee connected into the gas line that is capped on the bottom in which condensation and foreign particles may c...

Страница 8: ...ing tile etc 2 inches 51mm Provide adequate clearances around air openings Adequate accessibility clearances for purposes of servicing and proper operation must be provided Figure 3 Figure 4 COMBUSTIB...

Страница 9: ...rs Refer to Figure 8 4 Mount heater onto the 3 screwheads and complete tighteningthescrewheadstotheplasticexpansionanchors 5 Connect the gas line Figure 8 OPTIONAL FLOOR STAND INSTALLATION Figure 7 Op...

Страница 10: ...click when the safety magnet in the gas control is de energized Pilot can now be relighted Repeat steps 5 through 9 11 Turn gas control knob counterclockwise to HI 12 Replace front panel 13 Turn on a...

Страница 11: ...roper flame The main burner may be cleaned by forcing water into the ports and the throat of the burner The burner should be blown dry or heated to remove all water before replacing To remove main bur...

Страница 12: ...Check for gas leaks To Remove Main Burner Orifice 1 Grasp the orifice fitting with a 5 8 16mm open end wrench 2 Use 3 8 10mm open end wrench to remove main burner orifice from orifice fitting turn cou...

Страница 13: ...VF 140 Top Shield 10 VF 131 Chamber Back 11 P 213 Orifice NAT Gas 11 P 204 Orifice LP Gas 12 P 212 Orifice Fitting 13 VF 138 Front Shield Assembly 14 SR 209 Regulator Bracket 15 R 2784 Inlet Regulato...

Страница 14: ...Page 14 R 2688 PARTS VIEW...

Страница 15: ...de of front shield assembly by measuring down 9 229mm from the upper right corner of the shield assembly See Figure 1 Align 3 16 5mm spacer and oblong clearance hole on switch box with 1 8 3mm screw h...

Страница 16: ...to the adapter and be electrically grounded CAUTION Label all wires prior to disconnection when servicing controls Wiring errors can cause improper and dangerous operation Verify proper operation afte...

Отзывы: