
31451-2-1013
Page 13
INSTALLATION
Framing and Finishing
1. Choose unit location.
2. Frame in fireplace with a header across the top. It is important
to allow for finished face when setting the depth of the frame.
See Figure 10B.
3. Attach fireplace to frame using adjustable nailing flange. Preset
depth to suit facing material (adjustable to 3/8”, 1/2” or 3/4” depths).
NOTICE
: Fireplace must mount flush to facing material. If facing
material requires more depth than 3/4”, mark and drill two 1/8”
holes into fireplace side at appropriate depth. Bend standoff
tabs as needed to move fireplace flush with facing material.
See
Figure 10A.
4. Use eight 1/2” hex-head screws supplied in hardware package,
to screw through slotted holes in nailing flange and then screw
into pre-drilled holes on fireplace side. Measure from face of
fireplace to face of nailing flange to determine final depth.
Figure 10A
Figure 10B
Vent Pipe Clearance
NOTICE
:
Maintain one inch of clearance around top vent pipe.
See Figure 11B.
For rear vent, maintain a minimum 1” clearance to
the bottom and sides of the vent, and 3” clearance to combustibles
above the vent pipe.
See Figure 11A.
Figure 11A - Rear Vent
Figure 11B - Top Vent
Содержание DVP36DP31 Series
Страница 21: ...31451 2 1013 Page 21 Figure 30 Figure 31 Figure 32 EXAMPLES TOP VENT RUN...
Страница 37: ...31451 2 1013 Page 37 Figure 57 DVVK 4FV DIRECT VENT TERMINATION KIT...
Страница 47: ...31451 2 1013 Page 47 Figure 70 MILLIVOLT SYSTEM STANDING PILOT WIRING DIAGRAM...
Страница 59: ...31451 2 1013 Page 59 INTERMITTENT PILOT CONTROL SYSTEM TROUBLESHOOTING...
Страница 68: ...31451 2 1013 Page 68 PARTS VIEW...