
42603-4-0421
Page 9
In selecting a location for installation, it is necessary to provide ad-
equate accessibility clearances for servicing and proper operation.
Locating and Venting the Direct Vent Stove
Clearances:
When facing the front of the direct vent stove the
minimum clearances to combustible construction (material) are
the following:
Top of appliance (ceiling)
36" (914.4 mm)
Rear Wall
2" (50.8 mm)
Side Wall
6" (152.4 mm)
Heater Corners (45° angle) to Wall
4" (101.6 mm)
Floor
0" (0 mm)
Installation on Rugs and Tile
This appliance must be installed on a flat, solid, continuous surface
(e.g. wood, metal, concrete). This may be the floor, or it may be
raised up on a platform to enhance its visual impact. The continu-
ous surface may be covered with carpeting, vinyl, wood flooring
or other combustible material.
6” (153mm)
TO SIDE WALL
6” (153mm)
TO SIDE WALL
6” (153mm) TO
COMBUSTIBLE
MATERIAL
6” (153mm) TO
COMBUSTIBLE
MATERIAL
36” (915mm) TO CEILING OR
HORIZONTAL PROJECTION
ABOVE APPLIANCE
36” (915mm) TO CEILING OR
HORIZONTAL PROJECTION
ABOVE APPLIANCE
Figure 2
CLEARANCES
6" (153mm) TO
SIDEWALL
NOTE: HEATER INSTALLED AT 45° ANGLE IN CORNER
NOTE: HEATER INSTALLED AT 45° ANGLE IN CORNER
4” (102mm) HEATER CORNERS TO SIDE WALL
4” (102mm) HEATER CORNERS TO SIDE WALL
10” DVP20
(254mm)
10” DVP20
(254mm)
10”
DVP20
(254mm)
10”
DVP20
(254mm)
4”
(102mm)
4”
(102mm)
14” DVP30
(355mm)
14” DVP30
(355mm)
14”
DVP30
(355mm)
14”
DVP30
(355mm)
Figure 3
2” (51mm) TO COMBUSTIBLE MATERIAL
2” (51mm) TO COMBUSTIBLE MATERIAL
Figure 4
2" (51mm) TO COMBUSTIBLE MATERIAL
36" (915mm) TO
CEILING OR
HORIZONTAL
PROJECTION
ABOVE APPLIANCE
6" (153mm) TO
COMBUSTIBLE
MATERIAL
NOTE: HEATER
INSTALLED
AT 45° ANGLE
IN CORNER
4"
(102mm)
4" (102mm) HEATER CORNERS TO SIDEWALL
Содержание DVP20MS
Страница 27: ...42603 4 0421 Page 27 DVP20MS LOG PLACEMENT 5 Assembly is completed TOP VIEW FRONT VIEW...
Страница 33: ...42603 4 0421 Page 33 DVP30MS LOG PLACEMENT 5 Assembly is completed TOP VIEW FRONT VIEW...
Страница 47: ...42603 4 0421 Page 47 Figure 35 Figure 36 MAINTENANCE CONT D...
Страница 64: ...42603 4 0421 Page 64 APPLIANCE SERVICE HISTORY Date Dealer Name Service Technician Name Service Performed Notes...
Страница 65: ...42603 4 0421 Page 65 APPLIANCE SERVICE HISTORY Date Dealer Name Service Technician Name Service Performed Notes...
Страница 66: ...42603 4 0421 Page 66 APPLIANCE SERVICE HISTORY Date Dealer Name Service Technician Name Service Performed Notes...