38267-1-0319
Page 28
HORIZONTAL TERMINATION
One 90° Elbow
A
TO BOTTOM
OF UNIT
B
INSTALLED
VERTICALLY
1’
MINIMUM
EXAMPLE VENT RUNS
INITIAL PIPE
LENGTH
(In Inches)
A-Vertical
(In Feet)
B-Horizontal
(In Feet)
12
15
12
24
6
6
36
7
9
48
8
12
Figure 54
NOTE
: Pipe straps must be used every 2 feet to secure venting.
Two 45° Elbows
Installation requirements to replace the first 90° elbow with two
45° elbows:
B
A
EXAMPLE VENT RUNS
INITIAL PIPE
LENGTH
(In Inches)
A-Vertical
(In Feet)
B-Horizontal
(In Feet)
12
6
6
24
7
9
36
8
12
48
9
15
Figure 55
GENERIC MODEL SHOWN
Two 90° Elbows
NOTE
: Subtract 3 feet from the total horizontal measurement for
each 90° elbow installed horizontally. Subtract 1-1/2 feet from the
total horizontal measurement for each 45° elbow installed hori
-
zontally.
1’
MININUM
INSTALLED
HORIZONTALLY
B
A
EXAMPLE VENT RUNS
INITIAL PIPE
LENGTH
(In Inches)
A-Vertical
(In Feet)
B-Horizontal
(In Feet)
12
5
Not Allowed
24
6
3
36
7
6
48
8
9
Figure 56
Three 90° Elbows
1’
MININUM
B
INSTALLED
VERTICALLY
INSTALLED
VERTICALLY
A
TO BOTTOM
OF UNIT
EXAMPLE VENT RUNS
INITIAL PIPE
LENGTH
(In Inches)
A-Vertical
(In Feet)
B-Horizontal
(In Feet)
12
5
Not Allowed
24
6
6
36
7
9
48
8
12
Figure 57
GENERIC MODEL SHOWN
Содержание DVCT50CBP95-1
Страница 33: ...38267 1 0319 Page 33 This page is intentionally left blank...
Страница 45: ...38267 1 0319 Page 45 Date Dealer Name Service Technician Name Service Performed Notes APPLIANCE SERVICE HISTORY...
Страница 46: ...38267 1 0319 Page 46 Date Dealer Name Service Technician Name Service Performed Notes APPLIANCE SERVICE HISTORY...