Maintenance and Service:
•
To reduce risks of electric shock, disconnect all wiring before cleaning.
Always maintain caution during maintenance & service.
•
Even after the unit is disconnected from the Solar Panel / mains power supply (building wiring socket
outlet), components inside the SPG system are still connected to the battery and are still electrically live
and dangerous.
•
Before carrying out any kind of servicing and/or maintenance, disconnect the battery and verify
that no current is present.
CAUTION
RISK OF DAMAGE TO THE SPG
•
Never allow battery acid to drip on the SPG when reading gravity, or filling battery.
•
Never place the SPG unit directly above batteries; gases from a battery will corrode and damage the SPG.
•
Do not place a battery on top of the SPG. Failure to follow these instructions can damage the unit and/or
Damage other equipment.
Installation:
Overview of Installation Steps
•
Mount the SPG.
•
Connect the DC cables (Battery).
•
Connect the SPV cables (Solar).
•
Connect the AC cables (Mains).
Mount the SPG
1. Make sure that the SPG's switch is in the center position.
2. Select an appropriate mounting location and orientation. The SPG must be oriented in under a horizontal
surface.
3. Don't connect the AC input cable before connecting the battery cable.
5