Chapter 3 Installation 27
SmartCabinet Integrated Solution User Manual
cabinet and does not contact with the front / rear door, therefore, you need to adjust the position of the micro switch
before startup in field.
1. Loosen the two fixing screws on the micro switch metal kit.
2. Adjust the metal kit to the arrow direction shown in Figure 3-23, ensure that the opening and closing of the front /
rear door can trigger action of the micro switch, as shown in Figure 3-23.
A
A amplified
Fixing screw
(2 pcs)
Micro switch kit
Adjus
ting
dire
ction
Figure 3-23 Adjusting micro switch
3.7 Cable Connection
Note
1. You need to prepare external total input cable by yourself. Please use the cable that complies with local regulations as the
power cable of the SmartCabinet.
2. Bind the power cable and the communication cable separately on the cable organizers on both sides in the rear space of cabinet.
It is recommended to manage the power cable on the right cable organizer and manage the communication cables on the left
cable organizer.
The wiring of PMU, UPS, PDU, intelligent emergency fan unit and AC power inside the cabinet has been completed
before delivery. You only need to connect the cable between the UPS and the battery, and the UPS input and output
cables (lines have been reserved on the ports).
3.7.1 UPS Power Distribution Connection
1. Do not reverse the input neutral line and live line.
2. Connect the output neutral line and live line and ground line correctly and reliably. For the sake of safety, the
ground line must be connected firstly.
The power cables of the UPS should be connected through the I/O terminal block located on the UPS rear panel.
Remove the cover plate of I/O terminal block, and the terminal layout of the I/O terminal block is revealed, as shown
in Figure 3-24.