
Insertion adapter 2001990 for use with 3/4 in. MNPT threaded process
connection (-21 option)
Figure 2-4:
Procedure
1.
Mount the sensor in the pipe.
2.
Keep at least 1 in. (2.5 cm) between the sensor and pipe walls.
If the clearance is too small, calibrate the sensor in place.
3.
Mount the sensor in a vertical pipe run with flow from top to bottom.
If the sensor must be mounted in a horizontal pipe run, orient the sensor in the
3 o'clock or 9 o'clock position.
4.
Ensure that the sensor is completely submerged in liquid.
2.2
Insertion/Retraction Assembly Installation
Requirements
Insertion/Retraction Assembly Installation Requirements
Table 2-1:
Requirement
Description
Process connection
1-1/2 in. Larger openings may keep the sensor
from inserting far enough into the process liq-
uid.
Line size
3 in.; 2 in. line requires in-place calibration.
Valve
1-1/2 in. NPT full port valve (PN 9340065)
Retraction clearance
2 ft (0.6 m)
Excess vibration
Provide mechanical support if excess vibration is
expected.
Install
8
Reference Manual
Содержание Rosemount 228
Страница 1: ...Reference Manual LIQ MAN 228 Rev V April 2018 Rosemount 228 Toroidal Conductivity Sensors ...
Страница 2: ......
Страница 4: ......
Страница 6: ...Contents ii Reference Manual ...
Страница 26: ...Wiring diagram for Rosemount 1056 and 56 Transmitters Figure 3 2 Wiring 20 Reference Manual ...
Страница 34: ...Calibration 28 Reference Manual ...
Страница 36: ...Maintaining and Troubleshooting 30 Reference Manual ...
Страница 38: ...Accessories 32 Reference Manual ...
Страница 40: ...Return of Materials 34 Reference Manual ...
Страница 41: ...Return of Materials Rosemount 228 Sensor 35 ...
Страница 42: ...Return of Materials 36 Reference Manual ...
Страница 43: ...Return of Materials Rosemount 228 Sensor 37 ...