System Testing And Maintenance
Liebert
®
Mini-Mate2
™
58
compressor suction. The liquid quenching valve bulb senses this increased superheat and opens,
allowing liquid refrigerant to mix with the discharge gas, desuperheating it.
Proper mixing of the three refrigerant paths ensures stable operation and system performance. The
liquid quenching valve bulb must be located down steam of all these connections to control superheat
at the compressor inlet. Superheat settings for the liquid quenching valve are chosen to maintain
consistency with the system expansion valve. During hot gas bypass operation higher superheats,
50-60°F (10 to 15°C), may be observed at the compressor. The liquid-quenching valve is internally
equalized and superheat is not adjustable.
Adjustment
:
1. Install the suction and discharge pressure gauge.
2. Adjust temperature setpoint to call for cooling so that the refrigeration compressor will run
continuously.
3. Remove the TOP adjusting nut from the valve.
4. Insert an Allen wrench in the brass hole at top of valve in adjusting port, and turn CLOCKWISE
if a higher evaporator temperature is required. Adjust no more than 1/4 turn at a time. Let the
system stabilize for 15 minutes before determining if additional adjustment are necessary.
5. After obtaining the suction pressure required, reinstall cap tightly making sure there are no
leaks.
6. Let the evaporator operate for approximately 10 to 15 minutes to make sure the suction pressure
is within the range desired.
7. There may be a fluctuation of approximately 3 to 6 psig (21 to 41 kPa) on the evaporator due to
the differential on the hot gas bypass.
8. Return temperature setpoint to the desired setting.
Figure 31 Hot gas bypass
Содержание PFH020A-L
Страница 2: ...Precision Cooling For Business Critical Continuity Liebert Mini Mate2 User Manual 1 1 5 Tons 50 60Hz ...
Страница 3: ......
Страница 74: ...Liebert Prop Fan Condensing Unit 50 Hz and 60 Hz Installer User Guide ...
Страница 77: ...5 Troubleshooting 37 Vertiv Liebert PFH Installer User Guide ii ...
Страница 83: ...Figure 2 3 Dimensional data 277V step down transformer Vertiv Liebert PFH Installer User Guide 6 ...
Страница 86: ...Figure 2 6 General piping arrangement Vertiv Liebert PFH Installer User Guide 9 ...
Страница 87: ...Figure 2 7 Electrical field connections 1 to 5 ton units Vertiv Liebert PFH Installer User Guide 10 ...
Страница 88: ...Figure 2 8 Electrical field connections 8 ton units Vertiv Liebert PFH Installer User Guide 11 ...
Страница 89: ...Figure 2 9 Single phase 1 3 ton model schematic typical Vertiv Liebert PFH Installer User Guide 12 ...
Страница 90: ...Figure 2 10 Three phase 3 5 ton model schematic typical Vertiv Liebert PFH Installer User Guide 13 ...
Страница 105: ...Vertiv Liebert PFH Installer User Guide 28 This page intentionally left blank ...
Страница 109: ...Vertiv Liebert PFH Installer User Guide 32 This page intentionally left blank ...
Страница 116: ......