Checklist for Proper Installation
18
6.0
C
HECKLIST
FOR
P
ROPER
I
NSTALLATION
___ 1. Liebert XDCF modules are securely attached to the cabinet.
___ 2. Piping from Liebert XDP or Liebert XDC, with isolation valves,
properly
connected to each
Liebert XDCF module.
___ 3. Flex piping connections to prefabricated header assembly are secure and according to
specifications.
___ 4. Check the R-134a refrigerant charge.
___ 5. System checked for leakage.
___ 6. Run system and verify that the Liebert XDP or Liebert XDC and the Liebert XDCF modules
operate properly.
___ 7. Piping is insulated.
Содержание Liebert XDCF
Страница 1: ...Precision Cooling For Business Critical Continuity Liebert XDCF User Manual 10kW 2 8 Tons 34 000 BTUh ...
Страница 25: ...Specifications 21 NOTES ...
Страница 26: ...Specifications 22 ...
Страница 27: ......