Safety Instruction: 

The equipment has been designed and manufactured to meet international safety standards but, like any 
mechanical/electrical equipment, care must be taken if you are to obtain the best results. 

•  Service and maintenance of this unit, that is Electrical and Mechanical in nature should be carried out by technically 

trained and competent personnel. They should be familiar with Local Standards and Codes of Practice. 

•  When carrying out unit maintenance, ensure that the equipment is disconnected from the electrical power supply. 
•  Never Place the unit in flammable atmosphere. Do not bypass any Electrical and Product safety devices. 
•  Refrigerant used in this unit is classified under the COSHH regulations as an irritant, with set Occupational 

Exposure Levels (OEL) for consideration if installed in confined or poorly ventilated areas. 

•  Use personal protective equipment's (PPE's) while installation and commissioning the product at site. 
•  Under all Circumstances, any applicable local safety regulations requirement must be fulfilled. 
•  Ensure the proper earthing should be connected to condensing unit before starting the Unit. 
•  The condensing unit must only be used for its designed purposes with approved Refrigerants & lubrication oil, 

proper Electrical supply and within its scope of application. 

•  Do not start the unit until it is charged with refrigerant. Never charge the oxygen in the Unit/System 

•  Ensure that materials and wiring do not touch high temperature areas of the compressor & discharge line. 
• 

Never install a system and leave it unattended when it has no charge, a holding charge, or with the service valves 
closed without electrically locking out the system. 

•  Under running condition, the compressor and the tubing can reach temperatures high enough to induce burns 

and in case of leak of refrigerant avoid eye contact. 

•  During maintenance, if Brazing or De-brazing process is required. Kindly ensure that there should not be any 

refrigerant & oil inside the system pipe or the brazing area. 

•  Company shall not be responsible for any kind of accidents occur at sites due lack of sense of responsibility, 

Mis-handling, Wrong practice of installation and not following the instructions as mentioned above. 

• 
•  Do not pressurize the unit above 300 PSI in ideal conditions with Nitrogen, dry air,& Refrigerant. Always use pressure 

regular valve while connecting to Nitrogen cylinder. 

All units are shipped with a holding charge of dry nitrogen inside at a low but positive pressure. It is very important 
to check that this holding pressure exists at the time you receive each unit from us or our authorized representatives. 
Please inform us or our authorized representative if the holding charge is non-existent. Failure to do 
so could void the claim for other related system faults at a later period. 

Transit damage is essentially an insurance claim and is not covered under manufacturing defect. It is also 
advisable to inspect the rest of the unit for obvious physical damage and inform us or our authorized 
representative in case any is discovered. 

•  During transportation & storage, always keep the unit in vertical/upright position. 
•  Always move the CDU Boxes or pallet using shrink wrap packaging and all the boxes should be tighten 

properly with strapping tape. Because it may cause transit damage. 

• 
•  Always move the units in fully closed container/Vehicle to avoid from rain. 
•  Handle the unit with care. The packaging allows the use of a forklift or pallet jack for handling. Use appropriate 

and safe handling equipment. 

•  It is recommended not to open the packaging before the unit is at final place for installation. 

All the products are not released for use with caustic, poisonous or flammable substances. 

Do not stack single boxes on top of each other without pallet in any case. 

Receiving your unit 

Condensing Unit Handling 

Transport, Handling and Storage 

2

Содержание KHZ506

Страница 1: ...ZSI Scroll Condensing Units User Manual ...

Страница 2: ...on 10 Qualified Oils Refrigerant 10 Location and fixing 11 Installation Clearance 11 Refrigeration Piping Installation 12 Brazing Guideline Wiring Diagram Start Up and Operation Leak Test 15 System Evacuation Refrigerant charging Charge limit 16 Maintenance Application Tips 18 System Troubleshooting 21 System Start Up and Operation Check Sheet 23 Contact Lists 24 Table of Content 12 13 15 ...

Страница 3: ...r use only by qualified and or experienced personnel or technicians certified by us These instructions are general in nature for this family of products and due to our policy of continuous improvement some of the details may not apply to the unit that you are installing If in doubt please consult your local sales office quoting unit model and serial number as shown on the name plate In case of amb...

Страница 4: ...contact During maintenance if Brazing or De brazing process is required Kindly ensure that there should not be any refrigerant oil inside the system pipe or the brazing area Company shall not be responsible for any kind of accidents occur at sites due lack of sense of responsibility Mis handling Wrong practice of installation and not following the instructions as mentioned above Do not pressurize ...

Страница 5: ...apacity at 60Hz Btu hr Scope of Supply KH Motor Circuit Code Description 5 3 Phase Application Code Description L Low Temperature Voltage Range Code Description E 400V 380 420 50Hz 3Ph Compressor Family Code Description Z Scroll Compressor Refrigerant Code Description L R404a Code Description R CDU with Serviceable Chassis 3 ...

Страница 6: ...eliable operation On board CoreSense electronics unit for diagnostics and protection to assist contractors troubleshoot in the field Uses Liquid Injection technology controlled by CoreSense to protect the compressor from high discharge temperature LED display alerts user of DLT sensor status and EXV operation enabling easier troubleshooting Tropicalized for Indian climate to operate at higher ambi...

Страница 7: ...platform the CoreSense Control Board CoreSense regulates liquid injection by sensing the Discharge Line Temperature DLT to widen the operating envelope and enhance the product reliability It also features LED display that alerts the user of sensor status and Electronic Expansion Valve EEV operation The board will be used to turn the compressor on off based on the demand signal from low pressure sw...

Страница 8: ...Operate EXV Manually Short Push 2s Up or Down to open or close EXV by one step Long Push Up and Down to open and close EXV rapidly LED2 will flash when EXV is opening and will remain on when EXV is fully open LED3 will flash when EXV is closing and will remain on when EXV reaches minimum opening Push Up and Down together for 5 seconds to revert to Auto Mode Board will automatically revert to Auto ...

Страница 9: ...Sight glass CoreSense along with EXV Fan motor Serviceable chassis Blue fin coated condenser Receiver with valve Accumulator Oil separator Adjustable LP HP switch Liquid Line filter drier Moisture Indicator CDU service valves Electrical Terminals Crank Case Heater Important Note Above given Scope of supply comes with our Standard designed Models For any customized requirement of additional accesso...

Страница 10: ...ion Connection Kg dBA KHZ506LRL 1 160 Watts 230V 1Ph 50Hz 4 6 1043 x 440 x 805 656 402 5 8 3 8 96 5 60 KHZ508LRL 656 402 5 8 3 8 96 5 62 KHZ509LRL 656 402 5 8 3 8 96 5 63 KHZ511LRL 656 402 7 8 1 2 111 68 KHZ514LRL 656 402 7 8 1 2 140 71 KHZ515LRL 656 402 7 8 1 2 140 71 KHZ518LRL 2 5 7 1043 x 440 x 1140 656 402 7 8 1 2 169 73 KHZ521LRL 656 402 7 8 1 2 190 74 Power Input is 400V 3Ph 50Hz Figure 3 KH...

Страница 11: ... 2 5 Sq mm ZSI14KQE TFM 380 420V 50 Hz 3Ph 12 1 12A 2 5 Sq mm ZSI15KQE TFM 380 420V 50 Hz 3Ph 12 7 18A 2 5 Sq mm ZSI18KQE TFM 380 420V 50 Hz 3Ph 15 22A 4 0 Sq mm ZSI21KQE TFM 380 420V 50 Hz 3Ph 19 3 22A 4 0 Sq mm Always use AC 3 Category Contactor with above mentioned rating in table Refer below the operating envelope of the KHZXXXLRL CDU models Figure 4 Operating Envelope for KHZXXXLRLModels Refr...

Страница 12: ...y qualified personnel who are familiar with local codes and regulations and experienced with this type of equipment As lifting equipment is required ensure that it is suitable for purpose certified and that the operators are qualified to use it Safe working methods are identified and operator have suitable PPE s Ensure the working area has adequate ventilation during brazing procedures Disconnect ...

Страница 13: ...er each individual case carefully Ideally the unit should be mounted on a solid concrete slab with anti vibration pads between unit feet and concrete Ensure that there is no obstruction to air flow into or out of the unit Remove obstacles which block air intake or discharge The location must be well ventilated so the air can pass properly through condenser by maintaining the proper condensation in...

Страница 14: ... suction line should ideally slope gently towards the unit Recommendation slope is 1 200 1 250 P traps double risers and reduced pipe diameters may be required for suction lines where long vertical risers cannot be avoided All pipes should be adequately supported to prevent sagging which can create oil traps The recommended pipe clamp support distance is shown in the table Refrigeration Piping Ins...

Страница 15: ...10 Wiring Diagram 2 Fans Unit 13 ...

Страница 16: ...Wiring Diagram Single Fan Unit 14 ...

Страница 17: ... conditioning them before charging with refrigerant and the losses associated with improper evacuation erodes system efficiency as well as costly for the installers A 2 stage vacuum pump along with a micron gauge is recommended in performing evacuation The quality of vacuum is not determined by time a micron gauge must be used since it is the only device that accurately reads the vacuum pressure d...

Страница 18: ... charge 6 Now open the liquid service valve off the back seat With a good vacuum in the system system will in take 60 70 of the refrigerant required in the system without running the compressor 7 The compressor can then be started and the unit continued to be charged with liquid refrigerant through the suction service valve The quantity of charge should always be measured See note 8 The system nee...

Страница 19: ...e table below for the approximate Refrigerant holding capacity of Condensing Unit Refrigerant Charge KHZ506LRL EX 4 10 KHZ508LRL EX 4 10 KHZ509LRL EX 4 10 KHZ511LRL EX 4 10 KHZ514LRL EX 4 10 KHZ515LRL EX 4 10 KHZ518LRL EX KHZ521LRL EX 4 54 4 54 17 ...

Страница 20: ...ll joints should be checked for leaks during site visits All joints should be leak tested once a year Condenser Fan s and Motor s An annual inspection of these items is recommended Fastenings may loosen bearings may wear and fans may require cleaning of solid deposits which can cause imbalance WARNING TURN OFF OR DISCONNECT THE ELECTRICAL POWER SOURCE BEFORE CLEANING THE CONDENSER Application Tips...

Страница 21: ...al accessories for CDU Compressor model recommended by Company Check the electrical connections if they are properly attached secured and properly tightened Make sure all panels are secure and panel screws are properly tightened Check that the ampere draw doesn t exceed the amperage specified on the nameplate Check the phase unbalance if there is a three phase connection In single phase compressor...

Страница 22: ...0 22 8 9 1 38 8 6 14 4 29 1 56 4 23 7 9 7 39 8 7 13 9 30 0 57 9 24 5 10 2 40 9 8 13 3 31 0 59 3 25 4 10 2 40 9 9 12 8 31 9 60 8 26 2 11 4 43 1 10 12 2 32 8 62 3 27 1 12 0 44 3 11 11 7 33 8 63 9 28 0 12 6 45 4 12 11 1 34 8 65 4 29 0 13 2 46 6 13 10 6 35 8 67 0 29 9 13 8 47 8 14 10 0 36 8 68 6 30 9 14 4 49 0 15 9 4 37 8 70 2 31 8 15 1 50 2 16 8 9 38 8 71 9 32 8 15 7 51 5 17 8 3 39 9 73 5 33 8 16 4 5...

Страница 23: ...voltage Defective overload protector Refrigerant undercharge At compressor terminals voltage must be 10 of nameplate marking when unit is operating Replace check for correct voltage Add refrigerant High head pressure Low suction pressure Restriction in liquid line expansion device or filter drier Lack of sufficient indoor airflow Remove or replace defective component Clean check filters registers ...

Страница 24: ...ture in the system Liquid Flood back in the compressor Any Contamination Oil Dilute Replace Replace Check for correct voltage at compressor check and tighten all connections Recover refrigerant evacuate and recharge replace filter drier Ensure proper load Check oil quality replace with new oil do the commissioning as per procedure Compressor trip on IOLP Leakage in the System Compressor Stuck JAM ...

Страница 25: ... from Evap Client Details Facility Customer Name Address Contact Details Installer Installation Date Condensing Unit Info CDU Model Serial Number CDU Location Indoor Unit Make Model System Details Room Case ID Pipe Length approx OAT Start Up Check PSI Leak Test PSIG Duration Hours System is Leak Tight Y N Triple Evacuation Y N Micron Gauge Reading microns Total Evacuation PSIG of Hrs Refrigerant T...

Страница 26: ... Pune 411 057 Tel 91 20 4200 2000 Fax 91 20 4200 2099 Pvt Ahmedabad Emerson Climate Technologies India Ltd C o Agility Logistics Pvt Ltd Old Survey No 753 756 New Survey No 155 Off Cadila Estate Off Hotel Tulsi National Highway No 8 Aslali Taluk Daskroi Ahmedabad 382427 Tel 079 30924722 7600098528 Pvt ...

Отзывы: