
31
Options:
Input fused disconnect
Input circuit breaker
Input or output reactors
Dual motor overloads
Input RFI filter
Metasys N2 (Affinity BA only)
LONworks
Ethernet
7.2 Maintenance & Inspection
This section describes the basic periodic maintenance and inspection
procedures for the Electronic bypass.
Caution! To prevent electrical shock and damage, disconnect all power
before servicing the Electronic bypass package. Then wait at least ten
(10) minutes after the power supply is disconnected and all LEDs are
extinguished.
The Electronic bypass will function longer if kept clean, cool and dry, and if all
precautions highlighted in this manual are observed. Periodically inspect the
Electronic bypass package as described in the table below to prevent
accidents and to ensure high performance with high reliability.
Component
Check
Corrective Action
External terminals,
connectors, mounting
screws, etc.
Loose screws or
connectors.
Secure / tighten.
Heat sink
Build-up of dust and
dirt.
Blow with dry compressed
air (4 to 6kg-cm
2
pressure).
Printed Circuit Board
(PCB)
Accumulation of
conductive dust or oil.
Blow with dry compressed
air (4 to 6kg-cm
2
pressure). If
dust cannot be removed,
replace the board.
Cooling Fan
For abnormal noise and
vibration.
Replace the cooling fan.
Power components
Accumulation of dust
and dirt.
Blow with dry compressed
air (4 to 6kg-cm
2
pressure).
Содержание FPCBA
Страница 7: ...1 VFD Labels Typical Standard VFD Rating Label Typical VFD Approvals Label ...
Страница 8: ...2 2 3 Part Number Identification ...
Страница 40: ...34 Chapter 8 8 1 FPCSK Schematic ...
Страница 41: ...35 8 2 FPCBA Schematic ...
Страница 42: ...36 NOTES ...
Страница 43: ...37 Part Number 027 2201 Issue 1 1 Control Techniques Americas LLC 2009 ...