Maintenance
Operations concerning the integral slam shut version are in italic.
Servicing Check
Recommended frequency:
• Twice yearly minimum
Verification:
• Set point verification
• Regulator valve plug tightness
• Tripping and set point value
• Slam shut valve tightness
Departure positions
•
Inlet valve
Open
•
Outlet valve
Open
•
Slam shut valve plug
Open
•
Regulator
In operation
Inlet and outlet sides of regulator under pressure
Tightshut verification
(and tripping verification for
integral slam shut versions)
•
Inlet valve
Closed
•
Outlet valve
Closed
•
Regulator
Observe the evolution of the outlet
pressure (control regulator tightness)
Filter verification
•
Purge the filter
C
•
Verify the cartridge
If the outlet pressure increases Internal leak
Control the regulator valve plug
Control the regulator orifice
Control
the
pilot
or contact after-sales
If the outlet pressure decreases
External leak
Locate and seal the leak
or contact after-sales
If the outlet pressure is constant
The regulator is tightshut
Increase the set point until tripping occurs
(without exceeding the outlet limits)
If the slam shut valve plug will not close
Operating fault
Control the release relay
Control the slam shut valve plug
or contact after-sales
If the slam shut valve plug closes
Operating correctly
Observe the evolution of the outlet pressure (control tightness)
If the outlet pressure is constant
Purge the outlet side of the regulator
Observe the evolution of the outlet pressure (control tightness)
If the outlet pressure increases
Internal leak
Control the slam shut valve plug
Control the slam shut orifice
Control the bypass
or contact after-sales
If the outlet pressure is constant
Slam shut valve plug is tightshut
Table 12.
Troubleshooting for Types EZR and EZR-OS2 Regulators
Type EZR
10