Step 13
Figure 6-13:
14.
To install preamplifier housing hold preamplifier housing over pickup coil, connect
and hand tighten the cable connector to pickup coil. Lower explosion proof housing
over pickup coil and tighten collar nut of the quick connect union.
Meter assembly
Installation and maintenance instructions
49
Содержание Daniel PT Series
Страница 8: ......
Страница 10: ...Contents ii PT Liquid Turbine Meters ...
Страница 18: ...Dimensions and specifications of the meter 8 PT Liquid Turbine Meters ...
Страница 30: ... PT Meter exploded assembly Figure 4 1 General information about the meter 20 PT Liquid Turbine Meters ...
Страница 36: ...Step 7 Figure 5 7 8 Remove hanger blades from hanger hub Meter Disassembly 26 PT Liquid Turbine Meters ...
Страница 46: ...Meter Disassembly 36 PT Liquid Turbine Meters ...
Страница 62: ...Flow direction and flange ratings Figure 7 2 Inspection 52 PT Liquid Turbine Meters ...
Страница 64: ...Inspection 54 PT Liquid Turbine Meters ...
Страница 65: ...Inspection Installation and maintenance instructions 55 ...
Страница 66: ...Inspection 56 PT Liquid Turbine Meters ...
Страница 67: ...Inspection Installation and maintenance instructions 57 ...