Replacing the Backplane
Section 3: Meter maintenance
Maintenance and Troubleshooting Manual
January 2018
3-9000-772 Rev B
16.
If you are not replacing other electronics, replace the end caps, security latches, and
security seals.
17.
Apply power to the meter.
18.
Connect to the meter with Daniel MeterLink. Open the Meter Monitor (Detailed) view
and verify the meter is acquiring data, the transducers have good signals and flow
profiles for the chords are displayed and run the Zero Flow Calibration Wizard; select
the
Calibrate|Zero Calibrate
menu and generate the report. Then, collect and save a
Maintenance log to show the “as left” condition of the meter.
Or use AMS
TM
Device Manager or a HART® Field Communicator and select
Overview
|Zero Calibration|Start
menu or
Service Tools|Maintenance| Zero Calibration
|
Start.
19.
Close your application connection (Daniel MeterLink, AMS
TM
Device Manager or HART®
Field Communicator).
20.
Reinstall the thermal insulation wrap around the meter body, rigid and flexible conduit,
pipe standoffs and the LB conduit assemblies.
21.
This completes the Backplane board replacement procedure.
22.
If you encounter problems with this procedure, see the Daniel Customer Service
contact information on the back cover of this manual.
Содержание Daniel 3818
Страница 11: ...iv List of Tables List of Tables Maintenance and Troubleshooting Manual January 2018 3 9000 772 Rev B ...
Страница 96: ......
Страница 97: ......
Страница 98: ......
Страница 99: ......