58
Replacing the CPU Module
Section 3: Meter maintenance
Maintenance and Troubleshooting Manual
January 2018
3-9000-772 Rev B
8.
Connect to the meter with Daniel MeterLink. Open the Meter Monitor (Detailed) view
and verify the meter is acquiring data, the transducers have good signals and flow
profiles for the chords are displayed and run the Zero Flow Calibration Wizard; select
the
Calibrate|Zero Calibrate
menu and generate the report. Then, collect and save a
Maintenance log to show the “as left” condition of the meter.
Or use AMS
TM
Device Manager or a HART® Field Communicator and select
Overview
|Zero Calibration|Start
menu or
Service Tools|Maintenance| Zero Calibration
|
Start.
9.
Close your application connection (Daniel MeterLink, AMS
TM
Device Manager or HART®
Field Communicator).
10.
If you are not replacing other electronics, replace the end caps and security latches
(requires a 3 mm Allen wrench).
11.
If replacing other electronics or the fuse, continue with
Section 3.4.3
,
Section 3.4.4
,
Section 3.4.5
,
Section 3.4.6
or
Section 3.4.7
before replacing the end caps and sealing the
enclosure.
12.
If you encounter problems replacing the electronics, see the Daniel Customer Service
contact information on the back cover of this manual.
13.
This completes the CPU Module replacement procedure.
Содержание Daniel 3818
Страница 11: ...iv List of Tables List of Tables Maintenance and Troubleshooting Manual January 2018 3 9000 772 Rev B ...
Страница 96: ......
Страница 97: ......
Страница 98: ......
Страница 99: ......