38
Removing the shrouds
Section 3: Meter maintenance
Maintenance and Troubleshooting Manual
January 2018
3-9000-772 Rev B
3.1
Removing the shrouds
Important safety information - insulation handling
The Daniel 3818 LNG Ultrasonic Flow Meter body, LB conduit bodies and flexible conduit may
have customer-installed thermal insulation. When handling the customer-installed thermal
insulation, use industry best practices procedures, read and understand the manufacturer’s
Material Safety Data Sheet supplied with the thermal insulation.
Figure 3-2 3818 LNG Meter top assembly
A. Rigid conduit (45
o
elbow)
D.
B. Flexible conduit
C.
A.
B.
C. LB conduit body
D. Pipe standoff
E.
E. Top shroud assembly
Содержание Daniel 3818
Страница 11: ...iv List of Tables List of Tables Maintenance and Troubleshooting Manual January 2018 3 9000 772 Rev B ...
Страница 96: ......
Страница 97: ......
Страница 98: ......
Страница 99: ......